Germany – Installation of doors – Energieverwertung Schwaben gKU, doors and gates, construction of a new sewage sludge drying facility with pyrolysis and an administrative building
The planned building consists of halls for the sewage sludge upcycling plant and an administrative building. The hall is an L-shaped structure with a total length of 60.00 m and a width of 40.10 m. The hall is single-storey. The n
Opportunity description
The planned building consists of halls for the sewage sludge upcycling plant and an administrative building. The hall is an L-shaped structure with a total length of 60.00 m and a width of 40.10 m. The hall is single-storey. The northern part of the hall, which houses the delivery area, has a partial basement. The ridge height of the mono-pitched roof is approx. 11.12 m. The long side of the hall has a mono-pitched roof height of approx. 16.20 m. A pellet heating system is located in the south-western part of the hall. The hall will be constructed using a reinforced-concrete frame structure with a roof-supporting structure made of timber trusses with sandwich panels. The total gross floor area of the hall is 1,642 m². The administrative building is located to the southwest of the hall and will be constructed separately by means of a fire wall. The administrative building consists of a ground floor and an upper floor. It has a length of 15.19 m and a width of 9.89 m. The entire building will be constructed as a solid reinforced-concrete structure. The roof will be constructed as a flat roof with a parapet and bituminous waterproofing. The topmost storey, in which recreation rooms are possible, is situated on average 3.21 m above ground level. The administrative building consists of one usage unit. The gross floor area of the administrative building is 151 m², height 7.00 m. The bill of quantities and the schedule are additionally incorporated by reference. Gates/doors - Production (focus areas): - Steel doors - Accessories - Roller shutters - Technical processing Schedule requirements: Doors: Start 14.09.26; completion 09.10.26 Gates: Start 19.10.26; completion 30.10.26 In all other respects, reference is made to the schedule (contractual deadlines) in the procurement documents. The bill of quantities and the documents and plans contained in the procurement documents are additionally incorporated by reference. Procedure: open. Review the original TED notice for the complete requirement, lots, amendments and attachments.
Business details are available after sign in
Codes, capabilities, evidence, buyer details and marketplace actions are withheld from the public HTML and API response.