Germany – Installation work of refrigeration equipment – Tübingen, University, Cyber Valley Innovation Campus, 2nd construction phase CyVy 2nd construction phase 4.435.1 Refrigeration technology
CyVy 2nd construction phase 4.435.1 Refrigeration technology Containers and equipment: 2 hybrid dry coolers (RKW), each with 750 kW 1 water treatment system for RKW, biocide and hardness 1 refrigeration machine with free-cooling system 730 kW 3 pressure-maintaining systems for c
Opportunity description
CyVy 2nd construction phase 4.435.1 Refrigeration technology Containers and equipment: 2 hybrid dry coolers (RKW), each with 750 kW 1 water treatment system for RKW, biocide and hardness 1 refrigeration machine with free-cooling system 730 kW 3 pressure-maintaining systems for cold-water and cooling-water systems 4 plate heat exchangers 130 kW to 800 kW 2 plate heat exchangers 10 kW and 25 kW 5 dosing systems in accordance with VDI 2035 12 pressure expansion vessels 50 liters to 350 liters 5 central dirt/sludge separators DN 65 to DN 200 Installations: Approx. 3,500 meters of black steel pipe DN 15 to DN 200 Approx. 2,700 meters of stainless-steel pipe DN 25 to DN 125 8 distributors/collectors, volume flow 40.0 to 120.0 m³/h 14 refrigeration circulation pumps, volume flow 1.8 to 42.0 m³/h Approx. 105 cast-iron flanged fittings DN 15 to DN 150 Approx. 65 stainless-steel flanged fittings DN 15 to DN 150 Approx. 120 gunmetal threaded fittings DN 15 to DN 50 Approx. 330 drainage and venting fittings DN 15 and DN 20 Room cooling surfaces: Approx. 76 cassette/wall-mounted recirculating air coolers 1.5 kW to 5.5 kW Approx. 40 m² heating/cooling ceiling sails incl. accessories Procedure: open. Estimated value: 3,657,140.33 EUR. Review the original TED notice for the complete requirement, lots, amendments and attachments.
Business details are available after sign in
Codes, capabilities, evidence, buyer details and marketplace actions are withheld from the public HTML and API response.