Germany – Landscaping work – Cooperative School / Lot 17 - Outdoor Facilities
Lot 17 - Outdoor facilities Demolition work/site clearance: approx. 3490 m² topsoil removal, approx. 50 m pipeline, approx. 2 units manhole, approx. 245 m ball-stop fence demolition, approx. 2 units gate system, approx. 2400 m² asphalt pavement demolition, 1 unit tree felling Er
Opportunity description
Lot 17 - Outdoor facilities Demolition work/site clearance: approx. 3490 m² topsoil removal, approx. 50 m pipeline, approx. 2 units manhole, approx. 245 m ball-stop fence demolition, approx. 2 units gate system, approx. 2400 m² asphalt pavement demolition, 1 unit tree felling Earthworks: approx. 2845 m³ soil excavation for paved areas, approx. 1902 m³ soil replacement beneath subgrade Drainage: approx. 92 m drainage channel NW 100, approx. 4 units entrance grating, approx. 200 m PP wastewater sewer DN/OD 160 approx. 2 units flow-control manhole, approx. 30 units completion of manholes incl. manhole cover, approx. 1 unit stormwater retention, infiltration trench, V = 61 m³, approx. 1 unit stormwater retention, infiltration trench, V = 19 m³, approx. 2 units rainwater storage tanks, V = 5 m³ supply and install Paved areas: approx. 1680 m² concrete slabs, 40 x 60 x 12, approx. 585 m² concrete slabs, 30 x 30 x 8, approx. 55 m² grass grid pavers approx. 1875 m² EPDM surfacing, approx. 820 m concrete kerb, approx. 165 m elastic edging kerb, approx. 395 m³ base courses approx. 875 m³ frost protection layer, approx. 160 m² fall-protection wood chips, approx. 310 m² sand for volleyball facility, approx. 45 m² sand for long-jump facility supply and install Seating blocks: approx. 8 units concrete seating blocks, L = 200 cm Fences and gates: approx. 1 unit gate system, three-leaf; approx. 150 m ball-stop fence, h=4m Equipment: 1 unit rope pyramid, in-ground trampoline, shot-put facility, 2 units multi-purpose goals, 4 units basketball hoops, 1 unit two-room metal equipment shed, 1 unit table tennis table, 2 units nesting aids for starlings, 3 units custom-made seating elements Landscaping: approx. 1,700 m³ topsoil supply and installation, approx. 2,310 m² lawn seeding with fine grading approx. 340 m² meadow seeding (flowering meadow), approx. 7 units standard trees, approx. 180 units shrubs, approx. 84 m² perennial planting areas estimated duration: Completion of all construction work (all sections except the planting work sections and completion maintenance items): by 02.08.2027 Planting work (sections 2.9, 2.10, 4.12, 4.13, 4.14, 4.15): by 30.11.2027 Completion of completion maintenance (items 2.9.6, 2.10.24, 2.10.25, 2.10.27, 4.6.7, 4.13.12, 4.13.13, 4.14.20, 4.14.21, 4.15.3, 4.15.4, 5.2.6, 5.2.8): by 30.11.2028 Procedure: open. Review the original TED notice for the complete requirement, lots, amendments and attachments.
Business details are available after sign in
Codes, capabilities, evidence, buyer details and marketplace actions are withheld from the public HTML and API response.