Germany – Landscaping work – VE504 Construction of the outdoor facilities
VOB/A-EU procedure "Replacement construction of 3 halls and modernization measures in the existing buildings of the training center at the Soest location of Kreishandwerkerschaft Hellweg-Lippe" The contract award "Construction of the outdoor facilities" comprises earthworks, electrical, drainage
Opportunity description
VOB/A-EU procedure "Replacement construction of 3 halls and modernization measures in the existing buildings of the training center at the Soest location of Kreishandwerkerschaft Hellweg-Lippe" The contract award "Construction of the outdoor facilities" comprises earthworks, electrical, drainage, surfacing, concrete, structural steelwork, equipment, vegetation and planting work, including subsequent maintenance services. VOB/A-EU procedure "Replacement construction of 3 halls and modernization measures in the existing buildings of the training center at the Soest location of Kreishandwerkerschaft Hellweg-Lippe" The contract award "Construction of the outdoor facilities" comprises earthworks, electrical, drainage, surfacing, concrete, structural steelwork, equipment, vegetation and planting work, including subsequent maintenance services. Quantity: Remove vegetative ground cover incl. disposal: 2255 m² Clear shrub growth 100 to 500 cm incl. disposal: 1539 m² Remove concrete block paving incl. disposal: 3348 m² Remove clinker paving incl. disposal: 749 m² Break up and load asphalt incl. disposal: 4274 m² Remove edgings incl. disposal: 1923 m Excavate, load, transport and store subsoil incl. disposal: 1291 m³ Soil trench for electrical lines, bottom W 0.4-0.8m, D up to 0.8m: 428 m³ Supply PP cable protection conduit OD 110mm WT 3.4mm: 934 m Luminaire foundation for pole-mounted light: 43 St Utility channel NW 200 E600: 38 m Utility channel NW 320 E600: 37 m Soil trench for rainwater drainage pipes D up to 1.25m: 474 m³ PVC-U homogeneous sewer pipe OD DN160: 455 m Drainage channel NW 100 A15: 97 m Drainage channel NW100 C250: 115 m Drainage channel NW 100 E600: 81 m Concrete paving 20/20/10 cm incl. edgings on base courses to be installed and existing base courses: 278 m² Concrete paving 40/30/10 cm + 20/30/10 cm incl. edgings on base courses to be installed and existing base courses: 1227 m² Concrete paving 30/15/13 cm incl. edgings on base courses to be installed and existing base courses: 2507 m² Paving with grass joints incl. edgings on base courses to be installed and existing base courses: 2748 m² Asphalt concrete incl. edgings on base courses to be installed and existing base courses: 4503 m² Guidance system for the blind, guidance strips: 87 m² Guidance system for the blind, tactile stud panels: 8 m² Concrete block steps: 18 m Concrete seating steps: 8 m L-shaped retaining elements H: 50 cm: 52 m Handrail, galvanized and coated steel: 27 m Bicycle stands: 79 St Impact-protection bollards: 28 St Benches: 30 St Table-bench combinations: 2 St Tree planting incl. completion maintenance: 29 St Large shrub planting incl. completion maintenance: 33 St Perennial-grass planting incl. completion maintenance 1652 m² Sowing of flowering meadow or shaded border: 4141 m² Procedure: open. Review the original TED notice for the complete requirement, lots, amendments and attachments.
Business details are available after sign in
Codes, capabilities, evidence, buyer details and marketplace actions are withheld from the public HTML and API response.