Germany – Lift installation work – BZ BA-401 Lift Systems
Lift systems The Chamber of Crafts for Upper Franconia, headquartered in Bayreuth, is planning the construction of an education center at the Bamberg location. The construction site available for the new development consists of the properties with parcel num
Opportunity description
Lift systems The Chamber of Crafts for Upper Franconia, headquartered in Bayreuth, is planning the construction of an education center at the Bamberg location. The construction site available for the new development consists of the properties with parcel numbers 4406/14, 4450/2, 4450/1, and partly 4408. The new building for the Bamberg education center is intended to create a sustainably identity-defining ensemble that serves as an anchor in the district and forms the eastern boundary of the prospective urban development south of Forchheimer Straße, with service and educational uses. In keeping with the characteristics of a vocational education center, the property is divided into construction-site clusters that also take expansion areas into account. Internal and external access routes connect the clusters and create open spaces appropriate to their use. The orthogonal zoning is oriented toward the southern access road, as this also establishes connections to the anticipated development in the west. A 10m-wide green buffer is planned along Forchheimer Straße. As a rule and in accordance with their function, the clusters are formed by expansive single-story structures; only a four-story “Cube” at the heart of the building structure provides a symbolic presence and marks the main entrance. A two-story addition is planned for this structure as an expansion option, further reinforcing the concept. At the same time, the structure of the raised woodworking workshops terminates here. To the west, the building presents itself as a linear layered composition with a central high point. To the east, it is comb-like, with rhythmically arranged structures and courtyards. Supply and disposal services for the workshops are provided in the east via an internal road planned for two-way traffic; the woodworking workshops are accessed via the southwestern workshop yard. The courtyard between the eastern hall structures used for construction technology represents a thematic outward extension of the workshops; the central courtyard remains reserved for the attractive pedestrian connection, including a link to the expansion areas. Scope of services: The contractor’s services include all services required to construct the operational installation and comply with official requirements, with the exception of services provided by the client on site. The lift systems must be offered delivered free to the construction site, including packaging, all materials in accordance with the construction drawings and descriptions, installation, and commissioning by specialist installers. Costs for accommodation, allowances, travel, and transportation expenses must be included in the tender prices. The services include in particular: - Provision of the test weights for internal acceptance as well as the necessary auxiliary personnel - Lubricants for initial commissioning - Pit set and pit access - Supply and installation of shaft lighting in accordance with EN 81 with two-way switching, switchable from the control cabinet and shaft pit, including a Schuko socket - Supply of information and load signs, a description of the lift system and control system, general maintenance instructions and system drawings, a hand lamp, and two emergency unlocking keys - Disposal of packaging materials - complete final cleaning, swept clean, including the shaft space - all steel parts, with the exception of all surfaces that must remain bare for functional reasons, must be provided with corrosion protection. Damage must be repaired. All rotating parts shall receive a safety coating - Automatic system for evacuation to the nearest floor in the event of a power failure using a buffer battery - Supply of load hooks and/or anchor rails in the shaft head for load transport (installation or replacement), stating the respective load-bearing capacity - A spare-parts stockholding period of ³ 10 years must be guaranteed for the installed components. If a product is discontinued, replacement solutions must be offered immediately. Procedure: open. Estimated value: 61,300 EUR. Review the original TED notice for the complete requirement, lots, amendments and attachments.
Business details are available after sign in
Codes, capabilities, evidence, buyer details and marketplace actions are withheld from the public HTML and API response.