Germany – Load-bearing structure design services – Renovation of sports and multipurpose hall
Renovation of sports and multipurpose hall, roof of swimming pool hall Technical building equipment, structural design Renovation of sports and multipurpose hall, roof of swimming pool hall The existing multipurpose hall (swimming pool and sports hall) constitutes a central public facilit
Opportunity description
Renovation of sports and multipurpose hall, roof of swimming pool hall Technical building equipment, structural design Renovation of sports and multipurpose hall, roof of swimming pool hall The existing multipurpose hall (swimming pool and sports hall) constitutes a central public facility for school and club sports as well as for other community uses in the municipality. It was built in 1977. The hall is regularly used by several local clubs, such as the gymnastics, cycling, football, model sports, and music clubs, etc., as well as for school sports, and is occupied on every day of the week (Monday-Friday from 7:00 a.m.-11:30 p.m.). There is therefore a high quantitative need for the hall to remain permanently usable as an important component of the municipal infrastructure. During ongoing use, significant structural and technical deficiencies have become apparent, making renovation absolutely necessary. In particular, the current fire protection requirements are not met. Additional requirements for BMA and ELA exist. This poses a significant risk to the safe operation of the hall and already restricts the possibilities for its use. The roofs of the entire complex comprising the multipurpose hall, swimming pool hall, and foyer are severely leaky, resulting in moisture penetration. This affects both the building fabric and the safe use of the hall and causes further damage to the building. Inside, nearly all wastewater pipes are leaking and damaged, which is no longer acceptable from a structural, hygienic, or environmental perspective. Furthermore, accessibility is not fully provided. Measures are therefore also required in this area. In terms of quality, the multipurpose hall in its current condition thus no longer meets today’s requirements for safety, functionality, accessibility, and sustainable operation. Renovation is urgently required to ensure proper and safe operation, prevent consequential damage, and preserve the hall in the long term as a central sports and meeting venue for the school, clubs, and residents. The roof of the sports hall, including the supporting structure, must be completely dismantled and rebuilt. The hall floor is also to be removed and reinstalled; the grandstand and the walls are to be retained and must therefore be protected during the construction work. The fire protection systems of the sports hall and swimming pool hall will be revised and adapted to the existing requirements of the LRA. Since all buildings are supplied by a shared heating system, a temporary system must be provided for the duration of the construction period. No renovations will be carried out in the interior fit-out (such as showers, toilets, or changing rooms). These have already been renewed and are therefore not part of the measure. However, the wastewater pipes must be renewed. The underground pipes in the outdoor area must also be inspected and, if necessary, renovated. The ventilation system has already been renewed; during the measures, it must be dismantled, placed in storage, and subsequently reinstalled and connected. The same applies to the solar installations on the roofs of the foyer, connecting structure, and swimming pool hall. The roofs also have leaks. These are likewise to be dismantled and renewed. A roof shape that prevents standing water must be provided. In addition, measures to improve accessibility must be implemented. During the renovation of the multipurpose hall, attention will be paid to the use of sustainable, durable, and resource-efficient construction materials. Materials that support high energy efficiency, minimize environmental impact, and ensure a long service life will be used. Furthermore, recyclability, environmental compatibility, and low emissions will be taken into account when selecting the construction materials. This approach helps to reduce the ecological footprint of the renovation measures and to maintain the hall sustainably over the long term. Procedure: neg-w-call. Estimated value: 200,000 EUR. Review the original TED notice for the complete requirement, lots, amendments and attachments.
Business details are available after sign in
Codes, capabilities, evidence, buyer details and marketplace actions are withheld from the public HTML and API response.