Germany – Low-voltage installation work – Electrical and telecommunications systems with outdoor installations 70-00482-2180-426 - PR1281009-2180-B
Electrical and telecommunications systems with outdoor installations 70-00482-2180-426 * Dates for carrying out the main work on the construction site: Start of work 12.01.2027; end of work 15.09.2028 * Individual dates: Delivery of workshop and installation plans for approv
Opportunity description
Electrical and telecommunications systems with outdoor installations 70-00482-2180-426 * Dates for carrying out the main work on the construction site: Start of work 12.01.2027; end of work 15.09.2028 * Individual dates: Delivery of workshop and installation plans for approval 6 weeks after instruction and handover of plans Installation of the construction power and construction lighting system from 12.01.2027 Completion incl. commissioning and 1st rectification of defects by 07.04.2028, expert inspections May/June 2028, trial operation until mid-September 2028, VOB acceptances and 2nd rectification of defects mid-September–early October 2028 * Description of the procurement: 1 unit standby power supply system approx. 10kVA with approx. 200 emergency and RZL lights 1 unit low-voltage system with 2 incoming feeder panels for transformers, 3 outgoing feeder panels for circuit breakers, 5 outgoing feeder panels with NH disconnectors, each with transformer 18 units sub-distribution boards with 3-6 panels 1 unit energy management approx. 60m busbar 1,000A approx. 40km cable systems approx. 95km data lines approx. 3km routes and conduits approx. 3000 units Sammer holders approx. 2000 units switches and socket devices incl. KNX 18 units underfloor boxes with fittings 4 units double charging columns 2x11kW new approx. 800 lights approx. 1.6km lighting support rail approx. 30 units mast and bollard lights 1 unit intrusion detection system 16 door monitoring systems 13 units network cabinets 47HE approx. 1500 data connections 2 units bell and video door intercom systems 3 units nurse call systems for WC facility 2 units RWA systems for stairwells Fire protection measures for ceiling and wall penetrations Procedure: open. Review the original TED notice for the complete requirement, lots, amendments and attachments.
Business details are available after sign in
Codes, capabilities, evidence, buyer details and marketplace actions are withheld from the public HTML and API response.