Germany – Medium-voltage installation work – HAFUN - Medium-voltage installations
Description of the work: A new HAFUN research building is being constructed for the University of Hamburg, Department of Physics, on a separate plot on the DESY site. The building is planned with four basement levels, a ground floor
Opportunity description
Description of the work: A new HAFUN research building is being constructed for the University of Hamburg, Department of Physics, on a separate plot on the DESY site. The building is planned with four basement levels, a ground floor and four upper floors and approximately 14,260 m² of floor area. Laboratory rooms, office spaces, meeting and lecture rooms, and ancillary rooms will be created. The bill of quantities for the elevator systems comprises: - Medium-voltage main distribution board RRÜMTTTTTT - 6 cast-resin transformers 800 kVA Main works: 1 medium-voltage main distribution board RRÜMTTTTTT 45 m² raised-floor system MSHV with stairs, 1.00 m 10 m² grating floor system casemate with stairs, 1.00 m 6 cast-resin transformers 800 kVA 1 metering system, remote control, EZA controller, battery voltage supply Procedure: open. Review the original TED notice for the complete requirement, lots, amendments and attachments.
Business details are available after sign in
Codes, capabilities, evidence, buyer details and marketplace actions are withheld from the public HTML and API response.