Germany – Metalworking – Reutlingen, University of Applied Sciences, Building 22, Replacement Building for the Faculty of Applied Chemistry, Metalwork 1
Metalwork 1 Interior: Gratings in various sizes with a substructure of steel beams and railings in shafts on different levels, approx. 137 m². Maintenance walkways with a substructure of steel beams and rail
Opportunity description
Metalwork 1 Interior: Gratings in various sizes with a substructure of steel beams and railings in shafts on different levels, approx. 137 m². Maintenance walkways with a substructure of steel beams and railings, exhaust air plant room, 2 units, area approx. 17 m² total area. Entrance platforms for technical rooms, 3 units, approx. 13 m² total area. Grating stairs, 3 units in different designs. Foundations made of steel sections in technical plant rooms, tonnage approx. 6.5. Fixed ladders with safety cages, 3 units, climbing heights from approx. 4.15 to m. Stainless-steel chequer plate flooring in the nitrogen storage area, 16 m². Exterior: Sunken courtyard grating level, made of gratings in various sizes with a substructure of steel beams, approx. 190 m². Grating staircase, climbing height approx. 2.76 m. Grating walls, height from 2.20 to 3.75 m; three elements, approx. 51 m² total area. Roof technical foundations for dry coolers, tonnage approx. 4.15 t. West installation shaft, smoke extraction damper as shaft cover, size 1.3 x 1.3 m. Procedure: open. Review the original TED notice for the complete requirement, lots, amendments and attachments.
Business details are available after sign in
Codes, capabilities, evidence, buyer details and marketplace actions are withheld from the public HTML and API response.