Germany – Metalworking – Theodor-Fliedner-Stiftung | New Construction Alberichstraße | Metalwork
Theodor-Fliedner-Stiftung | New Construction Alberichstraße | Metalwork Building Section 1: New construction of a residential building with basement and underground parking garage (UG/TG), 3 above-ground full floors ground floor, 1st floor, 2nd floor) and a setback floor (3rd floor). Gross floor ar
Opportunity description
Theodor-Fliedner-Stiftung | New Construction Alberichstraße | Metalwork Building Section 1: New construction of a residential building with basement and underground parking garage (UG/TG), 3 above-ground full floors ground floor, 1st floor, 2nd floor) and a setback floor (3rd floor). Gross floor area, BGF: 3,886 sqm Enclosed volume, BRI: 12,315 cbm Building Section 2: New construction of a daycare center with one residential floor, without a basement, consisting of 2 above-ground full floors (ground floor, 1st floor) and a setback floor (2nd floor) Gross floor area, BGF: 2,704 sqm Enclosed volume, BRI: 9,858 cbm Both buildings will be constructed using solid construction. Procedure: open. Review the original TED notice for the complete requirement, lots, amendments and attachments.
Business details are available after sign in
Codes, capabilities, evidence, buyer details and marketplace actions are withheld from the public HTML and API response.