Germany – Metalworking – Conversion and Renovation of Gengenbach Town Hall - Metal Construction and Locksmith Work
Metal construction and locksmith work, town hall: - 1 pc. staircase extension, main stairwell, 2nd-4th floors: three-flight folded steel staircase with load-bearing stringers made of welded hollow sections, with railings and handrails, 36 steps - 1 pc. escape staircase as
Opportunity description
Metal construction and locksmith work, town hall: - 1 pc. staircase extension, main stairwell, 2nd-4th floors: three-flight folded steel staircase with load-bearing stringers made of welded hollow sections, with railings and handrails, 36 steps - 1 pc. escape staircase as a folded steel staircase with load-bearing stringers made of welded hollow sections, 15 steps - 1 pc. compensating staircase as a folded steel staircase with load-bearing stringers made of welded hollow sections, 8 steps - Handrails made of round steel, approx. 6m - 9kN impact protection for mounting the Advent calendar Intermediate building / basement: - Handrails made of round steel, approx. 21m - Bar railing + handrail for outdoor use, approx. 10m Building authority: - 2 pcs. outdoor staircase made of two HEB180 beams with precast reinforced-concrete steps - Bar railing for outdoor use - Handrail with floor mounting for outdoor use - 1 pc. compensating staircase as a folded steel staircase with load-bearing stringers made of welded hollow sections, 6 steps - 1 pc. secondary staircase to plant room, 6 steps - Grille door for outdoor use, approx. 1.65x3.35m - Stoplog for flood protection, approx. 1.05x2.85m Procedure: open. Review the original TED notice for the complete requirement, lots, amendments and attachments.
Business details are available after sign in
Codes, capabilities, evidence, buyer details and marketplace actions are withheld from the public HTML and API response.