Germany – Other building completion work – Solid surface material - New construction of the Goetheschule in Marl
The City of Marl is planning the construction of a new three-form-entry primary school on Hervester Straße as a star-shaped, two-story school building, as well as a single-story sports building. Both buildings are planned as timber structures on reinforced concrete foundation slabs.
Opportunity description
The City of Marl is planning the construction of a new three-form-entry primary school on Hervester Straße as a star-shaped, two-story school building, as well as a single-story sports building. Both buildings are planned as timber structures on reinforced concrete foundation slabs; the sports building will have a partial basement. The school building is designed in a cluster structure with classrooms, group rooms, specialist rooms, an administrative area, and a cafeteria/auditorium. The sports building houses a two-court sports hall, a teaching swimming pool, and ancillary rooms with changing and sanitary areas. For a heated bench along the swimming pool's glass façade, the contractor must manufacture and install the bench seat covering with a front downstand and rear upstand made of solid surface material (solid material), with a seamless appearance. Procedure: open. Review the original TED notice for the complete requirement, lots, amendments and attachments.
Business details are available after sign in
Codes, capabilities, evidence, buyer details and marketplace actions are withheld from the public HTML and API response.