Germany – Other electrical installation work – Stadtwerke Barsinghausen: Construction of the new Eckerde waterworks - VE 6 Energy Center (LV20)
Stadtwerke Barsinghausen GmbH has decided to build a new "Eckerde waterworks". The construction site and the foundations are located directly opposite the existing Eckerde drinking water treatment plant. The new waterworks is in accordance with
Opportunity description
Stadtwerke Barsinghausen GmbH has decided to build a new "Eckerde waterworks". The construction site and the foundations are located directly opposite the existing Eckerde drinking water treatment plant. The new waterworks is to be designed in accordance with the state of the art and equipped in terms of process engineering. The scope of this procurement relates to the construction of a stationary standby power system (emergency power supply), including delivery, installation, commissioning and documentation. The subject of the procurement is the turnkey delivery, installation, commissioning, instruction and documentation of a stationary standby power system (emergency power system) in a container design for the new Eckerde waterworks to be constructed by Stadtwerke Barsinghausen. The scope of services includes, in particular, the diesel emergency generator with an output of approximately 1,250 kVA, the emergency power control system and switchgear, the generator container including fuel supply, supply and exhaust air system, exhaust system, cabling, grounding and equipotential bonding, as well as all necessary ancillary services for the completion and handover of the system in operational condition. In addition, the required tests, documentation of the system and instruction of the operating personnel are part of the services. Procedure: open. Review the original TED notice for the complete requirement, lots, amendments and attachments.
Business details are available after sign in
Codes, capabilities, evidence, buyer details and marketplace actions are withheld from the public HTML and API response.