Germany – Power distribution cables – Cable supply for ESTW Solingen 2b
As part of the ESTW project Solingen construction stage 2b, trunk cables (power cables) are required for the power connection. Execution is planned for October 2026. Cable supply Solingen 2b Lot 1 Cable type NYYFGY-0 3x25 Cable supply Solingen 2b Lot
Opportunity description
As part of the ESTW project Solingen construction stage 2b, trunk cables (power cables) are required for the power connection. Execution is planned for October 2026. Cable supply Solingen 2b Lot 1 Cable type NYYFGY-0 3x25 Cable supply Solingen 2b Lot 2 Cable type NYYFGY-0 3x70 Cable supply Solingen 2b Lot 3 Cable types NYYFGY-0 3x35 + NYYFGY-0 3x6 + NYYFGY-0 3x10 Cable supply Solingen 2b Lot 4 Cable type NYYFGY-0 3x4 Procedure: neg-w-call. Review the original TED notice for the complete requirement, lots, amendments and attachments.
Business details are available after sign in
Codes, capabilities, evidence, buyer details and marketplace actions are withheld from the public HTML and API response.