Germany – Railway construction works – VB with GE Oberrohn–Bad Salzungen km 20.8–km 25.9
Track renewal with BR: Track renewal (assembly-line method): 4.871 m Track renewal (conventional): 240 m Complete track bed renewal (assembly-line method): 4.871 m Complete track bed renewal (conventional): 240 m Level crossinga
Opportunity description
Track renewal with BR: Track renewal (assembly-line method): 4.871 m Track renewal (conventional): 240 m Complete track bed renewal (assembly-line method): 4.871 m Complete track bed renewal (conventional): 240 m Level-crossing works km 20.844: Remove and reinstall level-crossing surface km 21.188: Renew level-crossing surface km 21.506: Renew level-crossing surface km 22.523: Renew level-crossing surface km 24.553: Renew level-crossing surface Safety services Procedure: open. Review the original TED notice for the complete requirement, lots, amendments and attachments.
Business details are available after sign in
Codes, capabilities, evidence, buyer details and marketplace actions are withheld from the public HTML and API response.