Germany – Reinforced-concrete work – Adaptation of shooting ranges, reinforced-concrete construction - Shooting facility - Bollingen
Reinforced-concrete construction - Shooting facility - Bollingen Reinforced-concrete construction: - Construct 80 m3 of reinforced-concrete foundations - Construct 500 m2 of reinforced-concrete walls, height up to 8 m, thickness varying between 20-60 cm - Construct 200 m2 inclined ceiling slab, thickness 30 cm
Opportunity description
Reinforced-concrete construction - Shooting facility - Bollingen Reinforced-concrete construction: - Construct 80 m3 of reinforced-concrete foundations - Construct 500 m2 of reinforced-concrete walls, height up to 8 m, thickness varying between 20-60 cm - Construct 200 m2 inclined ceiling slab, thickness 30 cm - Construct 800 m2 end wall, height approx. 11 m - Construct 10 reinforced-concrete baffles in the target area. Length approx. 22 m, height approx. 3.70 m, upper edge at approx. +7 m above ground level - Install 170 to of reinforcing steel - 100 m2 concrete repair - Erect, maintain and dismantle 8000 m2 of scaffolding for concrete repair and carpentry work Procedure: open. Review the original TED notice for the complete requirement, lots, amendments and attachments.
Business details are available after sign in
Codes, capabilities, evidence, buyer details and marketplace actions are withheld from the public HTML and API response.