The construction project comprises the construction of the new Kunkemühler Bridge as a tied-arch bridge with an orthotropic deck slab, the construction of new road ramps, the dismantling of the remaining bridge remnants of the partially demolished bridge, the remov
Opportunity description
The construction project comprises the construction of the new Kunkemühler Bridge as a tied-arch bridge with an orthotropic deck slab, the construction of new road ramps, the dismantling of the remaining bridge remnants of the partially demolished bridge, the removal of the sheet-pile-wall bottleneck on the eastern side of the canal with the construction of a sloped bank, as well as the construction of a temporary berth for floating in the superstructure, followed by the formation of a sloped bank on the western side of the canal. The construction project comprises the construction of the new Kunkemühler Bridge as a tied-arch bridge with an orthotropic deck slab, the construction of new road ramps, the dismantling of the remaining bridge remnants of the partially demolished bridge, the removal of the sheet-pile-wall bottleneck on the eastern side of the canal with the construction of a sloped bank, as well as the construction of a temporary berth for floating in the superstructure, followed by the formation of a sloped bank on the western side of the canal. approx. 212 t steel superstructure to be fabricated and installed approx. 1,800 m2 steel surface to be prime-, intermediate-, and top-coated approx. 230 m2 sealing layer to be applied to steel approx. 160 m2 thin surfacing to be constructed approx. 460 m2 mastic asphalt to be laid approx. 170 m various metal railings to be fabricated approx. 400 m3 concrete and reinforced concrete for abutments to be constructed approx. 270 m cast-in-place large-diameter bored pile D = 90 cm to be constructed approx. 78 t reinforcing steel to be installed approx. 1,900 m3 topsoil to be removed and reapplied approx. 3,400 m3 soil to be excavated for construction pits approx. 6,300 m3 soil to be supplied and installed approx. 1,000 m3 unbound layers to be constructed approx. 1,100 m2 bituminous base course and asphalt concrete to be constructed approx. 88 t steel sheet piles to be supplied and driven approx. 28 units grouted anchors to be constructed approx. 2,600 m3 wet dredging work to be carried out approx. 2,000 m3 granular filter to be supplied and installed approx. 1,700 m2 geotextile to be laid as a filter approx. 2,300 m2 riprap made of hydraulic engineering stones to be constructed Procedure: open. Estimated value: 5,800,000 EUR. Review the original TED notice for the complete requirement, lots, amendments and attachments.
Business details are available after sign in
Codes, capabilities, evidence, buyer details and marketplace actions are withheld from the public HTML and API response.