Germany – Road construction works – Farmsen Underground Station, Construction Lot 1, Road Construction (Lot 1)
The area of Farmsen Underground Station with the intersections August-Krogmann-Straße/Am Luisenhof and August-Krogmann-Straße/Berner Heerweg/Rahlstedter Weg, whose fundamental refurbishment and redesign are being tendered here, forms the cent
Opportunity description
The area of Farmsen Underground Station with the intersections August-Krogmann-Straße/Am Luisenhof and August-Krogmann-Straße/Berner Heerweg/Rahlstedter Weg, whose fundamental refurbishment and redesign are being tendered here, forms the central hub of Metrobus route 26 (MB26). It also connects the districts of Steilshoop to the west, Wellingsbüttel to the northwest and Rahlstedt to the east as an important part of the main road network. In parallel with this tender, the lots for gardening and landscaping (plantings) (specialist lots 1 & 2) and construction of a barrier-free ramp, including retaining walls at the southeastern underground station exit (construction lot 2), are being tendered. Principal works: Remove bituminous carriageway 10,200 m² Remove concrete pavement in bus traffic areas 600 m² Excavate and dispose of soil to the specified profile 5,200 m³ Construct full-depth bituminous carriageway 9,500 m² Construct drainage channel from MA 8 S 360 m² Construct concrete pavement in bus traffic areas, d = 28 cm 1,250 m² Paved peripheral area 8,270 m² Construct layer of frost-resistant material 2,000 m³ Construct crushed-stone base course, d = 30 cm 12,000 m³ Set granite kerbstones 1,900 m Set special bus kerb 190 m Construct road drains 71 units Construct connection pipe, DN 150, PP 700 m Procedure: open. Estimated value: 8,100,000 EUR. Review the original TED notice for the complete requirement, lots, amendments and attachments.
Business details are available after sign in
Codes, capabilities, evidence, buyer details and marketplace actions are withheld from the public HTML and API response.