Germany – Road tunnel construction work – A98, Bürgerwald Tunnel and Heidenäcker Tunnel, structural and operational-technical retrofitting
A98, Bürgerwald Tunnel and Heidenäcker Tunnel, structural and operational-technical retrofitting Mining excavation of rescue tunnel: 18.200 m3 Shotcrete: 4.000 m3 Reinforced concrete: 1.300 m3 Reinforcing steel: 250 t Soil nailing: 3.200 m Anchors: 13.000 m Opera
Opportunity description
A98, Bürgerwald Tunnel and Heidenäcker Tunnel, structural and operational-technical retrofitting Mining excavation of rescue tunnel: 18.200 m3 Shotcrete: 4.000 m3 Reinforced concrete: 1.300 m3 Reinforcing steel: 250 t Soil nailing: 3.200 m Anchors: 13.000 m Operational equipment for tunnel Reinforced concrete: 60 m3 Reinforcing steel: 5 t Cable laying 220.000 m Cable trench 1.700 m3 Cable protection conduits 5.000 m Procedure: open. Review the original TED notice for the complete requirement, lots, amendments and attachments.
Business details are available after sign in
Codes, capabilities, evidence, buyer details and marketplace actions are withheld from the public HTML and API response.