Germany – Roof-covering work – Roof-covering work
3.300 m² vapor barrier membrane; 1.400 m² tapered roof system, mineral wool; 1.260 m² mineral wool insulation boards on a slightly sloping wooden roof; 3.250 m² bituminous, two-layer roof waterproofing; 2.250 m² extensive green roofing; 600 m² mineral insulation boards; O
Opportunity description
3.300 m² vapor barrier membrane; 1.400 m² tapered roof system, mineral wool; 1.260 m² mineral wool insulation boards on a slightly sloping wooden roof; 3.250 m² bituminous, two-layer roof waterproofing; 2.250 m² extensive green roofing; 600 m² mineral insulation boards; skylights = 3x with ventilation function, 12x as RA, 3x in F90 quality, 1x as roof access hatch; 58 main and emergency roof drains; 150 m downpipes. The new building to be constructed, with a classroom wing, specialist teaching rooms, a three-court sports hall, changing-room wing and a three-stream daycare center, consists of up to three above-ground floors. see 2.1 Procedure Procedure: open. Review the original TED notice for the complete requirement, lots, amendments and attachments.
Business details are available after sign in
Codes, capabilities, evidence, buyer details and marketplace actions are withheld from the public HTML and API response.