Germany – Roof insulation work – Roof waterproofing work
Temporary roof drainage approx. 1,450 m2 Duo compact roof with 60 mm foam glass insulation and 80 mm XPS insulation approx. 8,800 m2 inverted roof with 3-layer bituminous waterproofing on reinforced concrete slabs and 240 mm XPS insulation approx. 5,400 m2 roof structure as ret
Opportunity description
Temporary roof drainage approx. 1,450 m2 Duo compact roof with 60 mm foam glass insulation and 80 mm XPS insulation approx. 8,800 m2 inverted roof with 3-layer bituminous waterproofing on reinforced concrete slabs and 240 mm XPS insulation approx. 5,400 m2 roof structure as a retention roof, with green roofing/gravel covering/slab covering approx. 400 m2 liquid waterproofing for external open staircases approx. 1,200 m2 liquid waterproofing for detail work Supply and install 4 smoke and heat exhaust skylight domes Supply and install approx. 50 m of aluminum movement profile Construct parapet and emergency roof drains, including connection to roof waterproofing Approx. 1,400 module support profiles for PV system Procedure: open. Review the original TED notice for the complete requirement, lots, amendments and attachments.
Business details are available after sign in
Codes, capabilities, evidence, buyer details and marketplace actions are withheld from the public HTML and API response.