Germany – Roof insulation work – Expansion of the Municipal Business School for the Integration of the State FOS - Roofing works
- Flat roof waterproofing: bituminous vapor barrier, 2-layer bituminous waterproofing; - Insulation work: PUR/PIR, EPS partly as tapered insulation - Sheet metal work - Main and emergency roof drainage - Smoke extraction, flat roof access hatch, gable rooflight complete sys
Opportunity description
- Flat roof waterproofing: bituminous vapor barrier, 2-layer bituminous waterproofing; - Insulation work: PUR/PIR, EPS partly as tapered insulation - Sheet metal work - Main and emergency roof drainage - Smoke extraction, flat roof access hatch, gable rooflight system, complete system, individual skylights Extensive green roof General services: - Construction site setup plan - Protective measures - Workshop and assembly planning - Structural calculations - Documentation Roofing works - Flat roof waterproofing: bituminous vapor barrier on reinforced concrete approx. 405m², bituminous vapor barrier on timber hollow-box ceiling: approx. 280m², 2-layer bituminous waterproofing 690m² - Insulation work: tapered PUR/PIR insulation: approx. 310m², tapered EPS insulation: approx. 395m² - Gravel fill roof ballast approx. 450m² - Flat roof drainage: internal main drainage 7 units, emergency drainage parapet scuppers 6 units - Insulated flat roof access hatch 1 unit, fixed-glazed F30 skylights 3 units, 7° gable rooflight complete system with smoke and heat exhaust ventilation system approx. 10m² - Maintenance railing approx. 25 linear meters - Sheet metal work: parapet coping profile: approx. 130m, wall connection profile: approx. 40m, parapet sheet-metal cladding approx. 70m - Extensive green roof approx. 200m² Procedure: open. Review the original TED notice for the complete requirement, lots, amendments and attachments.
Business details are available after sign in
Codes, capabilities, evidence, buyer details and marketplace actions are withheld from the public HTML and API response.