Germany – Roof insulation work – Riebeckstr. 50 Elementary School, Lot 3060 Roof Waterproofing Works
Lot 3060 Roof Waterproofing Works ATTENTION! THE DEADLINE FOR SUBMISSION OF TENDERS ENDS ON 24.06.2026, 13:00! Section 01 / Preparatory Works / Site Setup / Protective Measures - Temporary bridge, walkway, roof crossover 12 units - temporary roo
Opportunity description
Lot 3060 Roof Waterproofing Works ATTENTION! THE DEADLINE FOR SUBMISSION OF TENDERS ENDS ON 24.06.2026, 13:00! Section 01 / Preparatory Works / Site Setup / Protective Measures - Temporary bridge, walkway, roof crossover 12 units - temporary roof drainage 272 m - building protection 140 m² - Temporary roof waterproofing of penetrations, various sizes 12 units Section 02 / Vapor Barrier Separating Layer - Elastomer-bitumen welded vapor barrier membrane and preliminary work for various flat roof areas of 320 m², 405 m², 120 m², 75 m², 190 m² and 150 m² Section 03 / Thermal Insulation - Tapered roof insulation made of expanded rigid polystyrene foam boards for roof areas of 320 m², 405 m², 115 m², 75 m² and 110 m² - Tapered cellular glass insulation 140 m² Section 04 / Roof Waterproofing incl. Expansion Joints - Two-layer roof waterproofing: Lower roof waterproofing, PYE G 200 S 4 and upper roof waterproofing, PYE/PYP KTP 300 S5, root-resistant, for roof areas of 320 m², 405 m², 115 m², 75 m², 110 m² and 140 m² - Expansion joints 20 m Section 05 / Surface Protection - Gravel roof areas and protective layers 210 m², 145 m² - Extensive green roofing and protective and filter layers 450 m² - Gravel edge strips 180 m, 70 m - Paving slabs 90 m² - integrate on-site-installed support feet/Bigfoot system of ventilation system 150 units - Concrete slab surfacing for roof terrace incl. substructure 140 m² Section 06 / Roof Drainage, Built-in Components, Openings, Roof Access Hatches, Crossovers - Roof drains with trace heating 18 units - Parapet outlets for emergency drainage 14 units - HVAC roof penetrations, various sizes 32 units - Flat roof access hatch with stairs 2 units Section 07 / Roof Plumbing Works - Sheet-metal flashings - Plastic-coated roof edge covering 250 m Section 08 / Carpentry Works - Bat roosting area made of construction timber 5.5 m³, 640 m timber cutting - OSB 3 sheathing 140 m² - Timber crevice roost (individual chambers) 361 units Section 09 / Fall Protection Systems, Anchorage Points - Anchorage points 40 units - Edge protection 25 m Section 10 / Roof Repair, Building Section B - Extension Building - Removal and reconstruction of green roof 60 m² Section 11 / Replacement Measures for Species Protection - Supply 317 roosts for bats and nesting aids for bird species for installation in the façade by others Procedure: open. Review the original TED notice for the complete requirement, lots, amendments and attachments.
Business details are available after sign in
Codes, capabilities, evidence, buyer details and marketplace actions are withheld from the public HTML and API response.