Germany – Roof insulation work – New construction of the Fire Protection and Training Center (BAZ) at the Newel site
General description: The Trier-Land collective municipality is planning the construction of a central fire protection and training center in Newel in order to consolidate the supraregional functions of the collective municipality fire brigade, leverage synergies, and increase the op
Opportunity description
General description: The Trier-Land collective municipality is planning the construction of a central fire protection and training center in Newel in order to consolidate the supraregional functions of the collective municipality fire brigade, leverage synergies, and increase operational readiness. In the future, the building is intended to provide space not only for the secure accommodation of vehicles, but also for the storage and organization of a wide range of equipment. In addition to the aforementioned facilities, training and meeting rooms will be provided, not only for regular training and information on new techniques, regulations, and operational strategies, but also for the centralized initial and continuing training of the fire brigade staff throughout the Trier-Land collective municipality. The training area will be complemented by a practice yard and a practice wall specially designed for practical instruction and training. The fire brigade workshop areas will be supplemented by additional office and workshop areas of the collective municipality (municipal works yard, forestry special-purpose association) in order to cover a broader range of inspection, maintenance, and repair work. The ground floor and upper floor of the two-story building structure are planned as a solid reinforced-concrete construction with a high degree of prefabrication. The exterior walls consist of reinforced-concrete cavity walls, will be thermally insulated, and will receive an aluminum curtain wall with freely configurable profile geometry. The vehicle hall is to be constructed as a conventional reinforced-concrete frame structure. The partition wall between the vehicle hall and the adjoining ancillary-room program is planned as a reinforced-concrete thermal wall. Inside, the reinforced-concrete cavity walls are predominantly to remain exposed. The roof structure, in the form of a green roof with a PV system, rests on reinforced-concrete girders and consists of a load-bearing trapezoidal sheet-metal shell configured as a warm-roof assembly, with acoustic perforations on the underside. Roof waterproofing work is required here. BAZ vehicle hall: - Approx. 940 m² of roof waterproofing work incl. vapor barrier and waterproofing - Main and emergency drainage - Core drilling - Supply and exhaust vents, refurbishment vents - Water collection boxes - Approx. 22m of water drainage pipes - Approx. 262 m of fall-protection cable system - Approx. 933 m² of extensive green-roof assembly BAZ operations building - Approx. 1200 m² of roof waterproofing work incl. vapor barrier and waterproofing - Main and emergency drainage - Core drilling - Supply and exhaust vents, refurbishment vents - Water collection boxes - Approx. 83m of water drainage pipes - 3 units skylight domes and 1 unit RWA - Approx. 990 m² of extensive green-roof assembly OUTDOOR STORAGE - Approx. 260 m² of roof waterproofing work incl. vapor barrier and waterproofing - Main and emergency drainage - Core drilling - Supply and exhaust vents, refurbishment vents - Water collection boxes - Approx. 23m of water drainage pipes - Approx. 73 m of fall-protection cable system - Approx. 240 m² of extensive green-roof assembly Waterproofing of floor slab - Approx. 630 m² waterproofing with torch-applied bitumen membrane Roof maintenance - Flat-rate maintenance fee for roof maintenance 2x annually Roof waterproofing work is required here. The exact details are to be taken from the bill of quantities. BAZ vehicle hall: - Approx. 940 m² of roof waterproofing work incl. vapor barrier and waterproofing - Main and emergency drainage - Core drilling - Supply and exhaust vents, refurbishment vents - Water collection boxes - Approx. 22m of water drainage pipes - Approx. 262 m of fall-protection cable system - Approx. 933 m² of extensive green-roof assembly BAZ operations building - Approx. 1200 m² of roof waterproofing work incl. vapor barrier and waterproofing - Main and emergency drainage - Core drilling - Supply and exhaust vents, refurbishment vents - Water collection boxes - Approx. 83m of water drainage pipes - 3 units skylight domes and 1 unit RWA - Approx. 990 m² of extensive green-roof assembly OUTDOOR STORAGE - Approx. 260 m² of roof waterproofing work incl. vapor barrier and waterproofing - Main and emergency drainage - Core drilling - Supply and exhaust vents, refurbishment vents - Water collection boxes - Approx. 23m of water drainage pipes - Approx. 73 m of fall-protection cable system - Approx. 240 m² of extensive green-roof assembly Waterproofing of floor slab - Approx. 630 m² waterproofing with torch-applied bitumen membrane Roof maintenance - Flat-rate maintenance fee for roof maintenance 2x annually Procedure: open. Review the original TED notice for the complete requirement, lots, amendments and attachments.
Business details are available after sign in
Codes, capabilities, evidence, buyer details and marketplace actions are withheld from the public HTML and API response.