Germany – Roof works and other special trade construction works – Roof waterproofing works
Roof waterproofing works, Emmy Noether School, construction of a new grammar school Main item: Roof waterproofing works including insulation works and installation of rooflights Other: Plans will be distributed via a plan server (planfre
Opportunity description
Roof waterproofing works, Emmy Noether School, construction of a new grammar school Main item: Roof waterproofing works including insulation works and installation of rooflights Other: Plans will be distributed via a plan server (planfred), which will be made available to the contractor free of charge. It must be taken into account in the tender calculation that price is not the only criterion. Annex 227 must be observed. Physical attendance at the weekly coordination meetings (construction meetings) is mandatory and must be factored into the tender accordingly. - approx. 7,000 sqm substrate shot-blast, vacuum and clean - approx. 1,550 sqm mill concrete substrate - approx. 16 concrete core drillings, diam. 100-300mm, D 30-35cm, use of equipment possible - approx. 6,950 sqm primer, bitumen emulsion, airtightness/vapour-diffusion layer, Al bitumen membrane - approx. 1,500 sqm primer, bitumen emulsion, airtightness/vapour-diffusion layer, Al bitumen membrane - approx. 6,800 sqm compact roof, horizontal roof waterproofing, BROOF, 2-layer polymer-bitumen roofing membrane PYE-PV200DD, elastomer-bitumen adhesive compound, polymer-bitumen torch-on membrane PYE/PYP-KTPS5 - approx. 820 sqm compact roof, vertical roof waterproofing, BROOF, 2-layer polymer-bitumen roofing membrane PYE-PV200DD, elastomer-bitumen adhesive compound, polymer-bitumen torch-on membrane PYE/PYP-KTPS5 - approx. 675 sqm compact roof waterproofing, liquid-applied waterproofing 2K-PMMA, BROOF, insert 110g/m2, D 2.1mm, H 200-1000mm - approx. 200 sqm inverted roof waterproofing, liquid-applied waterproofing 2K-PMMA, BROOF, insert 110g/m2, D 2.1mm - approx. 270 sqm roof waterproofing, BROOF, 2-layer bitumen roofing membrane G200DD, hot-bitumen adhesive compound, polymer-bitumen torch-on membrane PYE-G200S4 - approx. 6,950 sqm thermal insulation layer, flat roof, cellular glass CG DAA dx 0.038W/(mK), D 100-200mm, 1-2 layers - approx. 1,060 sqm tapered insulation layer, flat roof, slope 1-2%, cellular glass CG DAA dx 0.038W/(mK), D 120mm, single layer - approx. 48 flat-roof parapet drains, gravity drainage, stainless steel, DN70-100, heatable - approx. 40 self-regulating heating cables, L 4.5m - approx. 500 linear m circular metal rainwater downpipe, size 50-100, stainless steel, D 0.6-1.2mm, vertical/inclined - approx. 50 stainless-steel pipe bends, 45-72 degrees, DN 70-100 - approx. 700 linear m parapet coping, aluminium, D 3mm, cut width 800-1000mm, folded 4 times - approx. 1.3500 linear m parapet coping profile, coated aluminium, D 3mm, cut width 450-650mm, folded 3 times, vertical - approx. 63 sqm upstand structure for F90 rooflight as a post-and-beam construction, steel, wet-painted/anodised - approx. 43 sqm upstand structure for rooflight as a post-and-beam construction, aluminium, wet-painted/anodised - approx. 8,000 sqm protective measures for horizontal waterproofing, building-protection mat, D 8-10mm - approx. 450 sqm protective measures for vertical waterproofing, building-protection mat, D 8-10mm - approx. 400 sqm protective measures for stair surfaces, building-protection mat, D 8mm Procedure: open. Review the original TED notice for the complete requirement, lots, amendments and attachments.
Business details are available after sign in
Codes, capabilities, evidence, buyer details and marketplace actions are withheld from the public HTML and API response.