Germany – Scaffolding work – SV-MAL-260813-001 - Provision of scaffolding, removal / reinstallation of ceiling panels incl. cleaning and, if applicable, external storage
Preparatory services, during subway closure periods (generally approx. 01:30 to approx. 4:00 a.m.), for the investigation of the tunnel crown constructed using the NATM method for voids by: - Creating construction site setup areas for storing ceiling panels on site or
Opportunity description
Preparatory services, during subway closure periods (generally approx. 01:30 to approx. 4:00 a.m.), for the investigation of the tunnel crown constructed using the NATM method for voids by: - Creating construction site setup areas for storing ceiling panels on site or transporting them away and storing them externally - provision of mobile track scaffolding, scaffolding, delivery / removal, assembly / dismantling, repositioning - Laying out sheeting for protection against dirt during exploratory drilling in the crowns - Openings (removal and reinstallation) in the ceiling structures, incl. cleaning the underside of the panels after reinstallation, in stations constructed using the NATM method - Delivery / collection, provision of single-person lifts and a scissor lift for two persons Procedure: neg-w-call. Review the original TED notice for the complete requirement, lots, amendments and attachments.
Business details are available after sign in
Codes, capabilities, evidence, buyer details and marketplace actions are withheld from the public HTML and API response.