Germany – Screed works – Screed works 2A
approx. 1.075 m2 bitumen welding membrane with aluminum insert V60 S4 + AL approx. 3.475 m2 shot blasting approx. 965 m2 thermal insulation approx. 965 m2 impact sound insulation approx. 965 m2 cement screed d = 70-75 mm as floating screed approx. 965 m2 surcharge for rapid
Opportunity description
approx. 1.075 m2 bitumen welding membrane with aluminum insert V60 S4 + AL approx. 3.475 m2 shot blasting approx. 965 m2 thermal insulation approx. 965 m2 impact sound insulation approx. 965 m2 cement screed d = 70-75 mm as floating screed approx. 965 m2 surcharge for rapid screed approx. 3.475 m2 mineral bonding bridge approx. 3.475 m2 surcharge for wet bonding bridge, 2-layer, approx. 3.400 m2 cement screed d = 80 mm as bonded screed approx. 75 m2 cement screed d = 160 mm as bonded screed approx. 3.475 m2 surcharge for rapid screed approx. 80 m sound-insulating and expansion joint profiles Procedure: open. Review the original TED notice for the complete requirement, lots, amendments and attachments.
Business details are available after sign in
Codes, capabilities, evidence, buyer details and marketplace actions are withheld from the public HTML and API response.