Germany – Sewage-treatment plant construction work – Erfurt Sewage Treatment Plant, replacement construction of primary settling tanks and stormwater overflow basin, 1st construction phase - Construction work
Erfurt-Kühnhausen Sewage Treatment Plant Replacement construction of primary settling tanks and stormwater overflow basin, 1st construction phase RÜB - Construction work Erfurt-Kühnhausen Sewage Treatment Plant Replacement construction of primary settling tanks and stormwater overflow basin, 1st construction phase RÜB - Construction work Approx. 14.500 m³ earthworks Approx. 2.30
Opportunity description
Erfurt-Kühnhausen Sewage Treatment Plant Replacement construction of primary settling tanks and stormwater overflow basin, 1st construction phase RÜB - Construction work Erfurt-Kühnhausen Sewage Treatment Plant Replacement construction of primary settling tanks and stormwater overflow basin, 1st construction phase RÜB - Construction work Approx. 14.500 m³ earthworks Approx. 2.309 m³ concrete/reinforced-concrete demolition 4 units dismantling of VKB equipment (scraper bridge, channel, fittings, miscellaneous) Approx. 2.740 m bored piles (excavation support) Approx. 1.115 m² shoring, sheet-pile wall, partly with pre-drilling Approx. 610 m² shoring, soldier-pile wall, partly with pre-drilling Approx. 770 m² shoring, inserted soldier-pile wall Approx. 1.760 m² trench shoring Approx. 1.225 m micropiles (114 units) Approx. 48 m sewer/pipeline construction, DN 1000 Approx. 211 m sewer/pipeline construction, DN 600 Approx. 46 m sewer/pipeline construction, DN 400 Approx. 39 m sewer/pipeline construction, DN 250 Approx. 270 m pipeline construction, DN 40-200 Approx. 1.550 m cable protection conduits Approx. 3.120 m³ reinforced-concrete work Approx. 19 t structural-steel work Approx. 42 m² masonry work Approx. 14 m² roofing Approx. 23 m stainless-steel pipeline DN 800 with various fittings and flanges Approx. 400 m² concrete pavement for footpaths, roadways and other areas Approx. 760 m² asphalt pavement Approx. 230 m curbstones, various designs Approx. 3.600 m² lawn seeding Approx. 39 units shrubs supplied and planted Approx. 3 units trees supplied and planted as well as demolition, concrete-cutting, topsoil, waterproofing, other metalwork, painting, jointing, fair-faced concrete work, shop drawings Procedure: open. Review the original TED notice for the complete requirement, lots, amendments and attachments.
Business details are available after sign in
Codes, capabilities, evidence, buyer details and marketplace actions are withheld from the public HTML and API response.