Germany – Sewage work – Connection of the Trier-Ehrang wastewater treatment plant to the Trier main wastewater treatment plant
VE06: Conversion work at the Ehrang wastewater treatment plant, civil and structural engineering Excavation for trenches and structures: approx. 2,200 m3 PE pipes SDR 11, DN/OD 400: approx. 36 m PE pipes SDR 11, DN/OD 250: approx. 32 m PE pipes SDR 17, DN/OD 400: approx. 15 m PE pipes SDR 17, DN/OD
Opportunity description
VE06: Conversion work at the Ehrang wastewater treatment plant, civil and structural engineering Excavation for trenches and structures: approx. 2,200 m3 PE pipes SDR 11, DN/OD 400: approx. 36 m PE pipes SDR 11, DN/OD 250: approx. 32 m PE pipes SDR 17, DN/OD 400: approx. 15 m PE pipes SDR 17, DN/OD 140: approx. 10 m PE pipes SDR 17, DN/OD 90: approx. 55 m PE pipes SDR 17, DN/OD 40: approx. 70 m PVC protective conduit OD 160 and 110: approx. 440 m Secant bored pile wall DN900: approx. 760 m drilling approx. 640 m concrete/reinforced concrete Reinforced concrete structures: approx. 270 m3 Formwork for structures: approx. 1,000 m2 Precast reinforced concrete manholes: 2 units incl. the associated ancillary services Procedure: open. Review the original TED notice for the complete requirement, lots, amendments and attachments.
Business details are available after sign in
Codes, capabilities, evidence, buyer details and marketplace actions are withheld from the public HTML and API response.