Germany – Soil-stripping work – Eastern City Entrance - Redesign of Mühleninsel, 1st construction phase - Construction site preparation - Demolition, felling, terrain modeling
Construction site preparation - Demolition, felling, terrain modeling 9,000 m² mowing of vegetated areas 9,000 m² removal of the vegetated soil layer 2,500 m³ topsoil removal and safeguarding by stockpiling in windrows, as well as reinstallation 720 m³
Opportunity description
Construction site preparation - Demolition, felling, terrain modeling 9,000 m² mowing of vegetated areas 9,000 m² removal of the vegetated soil layer 2,500 m³ topsoil removal and safeguarding by stockpiling in windrows, as well as reinstallation 720 m³ soil excavation for reinstallation 150 m³ earthworks for small-scale explosive ordnance investigations 1,000 m² demolition and disposal of bituminous surfaces 350 m² demolition and disposal of paved areas 1,600 m³ demolition of crushed-stone base and surface courses and safeguarding by stockpiling in windrows 3 units dismantling of street-lighting installations and transport to the storage site Disconnection and safeguarding of street-lighting lines Demolition and disposal of general equipment Demolition and disposal of foundations Construction of site-facility areas Securing the construction site with construction fencing Procedure: open. Review the original TED notice for the complete requirement, lots, amendments and attachments.
Business details are available after sign in
Codes, capabilities, evidence, buyer details and marketplace actions are withheld from the public HTML and API response.