Germany – Sports hall construction work – 26E Construction works
- preparatory planning for semi-precast elements, components made of watertight concrete, structural calculations for falsework; - approx. 160 m of edge protection, assembly/disassembly, covers for openings as safety measures; - construct approx. 1,660 m3 of excavations for lean-concrete strips;
Opportunity description
- preparatory planning for semi-precast elements, components made of watertight concrete, structural calculations for falsework; - approx. 160 m of edge protection, assembly/disassembly, covers for openings as safety measures; - construct approx. 1,660 m3 of excavations for lean-concrete strips; - rework and compact approx. 2,165 m2 of gravel layer provided by the client; - approx. 545 m of lean-concrete strips made of C12/15; - approx. 545 m of reinforced-concrete strip foundations; - construct approx. 2,450 m2 floor slab made of watertight concrete C 30/37 on a filter layer, blinding layer, perimeter insulation and lean-concrete protective layer; - 1 HA pit made of watertight concrete; - approx. 2,500 m2 fresh-concrete composite waterproofing system on the floor slab and foundation sides; - approx. 1,900 m of construction joints in concrete components; - approx. 2,070 m2 of walls made of twin-wall panels, with infill concrete; - approx. 350 m2 of precast floor slabs with concrete topping; - penetrations and core drilling in concrete components; - approx. 200 tonnes of reinforcing steel, diameter 6 to 32 mm; - approx. 450 m of horizontal waterproofing beneath walls made of twin-wall panels; for further details, see the bill of quantities Procedure: open. Review the original TED notice for the complete requirement, lots, amendments and attachments.
Business details are available after sign in
Codes, capabilities, evidence, buyer details and marketplace actions are withheld from the public HTML and API response.