Germany – Structural shell work – Ludwigsdorf Federal Police - Conversion of Buildings 4 and 9 with connecting structure
Structural shell work, 2nd construction phase Scope of work, Building 9: - 900m³ backfill, excavate, transport, store 0,3km, depth up to 4m, refill - 40m³ backfill, excavate, transport, collect, load onto contractor's truck, depth up to 4m, dispose of - 170m demolition of drainage sewer
Opportunity description
Structural shell work, 2nd construction phase Scope of work, Building 9: - 900m³ backfill, excavate, transport, store 0,3km, depth up to 4m, refill - 40m³ backfill, excavate, transport, collect, load onto contractor's truck, depth up to 4m, dispose of - 170m demolition of drainage sewer - 130m demolition of drainage pipe - 520m² demolition of perimeter insulation - Demolish and reconstruct 12 light-well heads - 720 m² renewal of waterproofing of existing exterior basement walls, as FDP reactive waterproofing with perimeter insulation, - 125 m drainage pipe made of fully perforated plastic pipe, form A, PVC-U, DN 100 - 9 flushing/inspection/collection chambers made of PVC-U, DN 315, construction height 200-450cm - 90m saw cut in reinforced-concrete floor slab/floor ceiling up to D=20cm - Demolish 62m² reinforced-concrete floor slab/floor ceiling up to D=20cm - 1 chamber for lifting system made of watertight concrete - 36m wastewater sewer made of PP-MD solid-wall pipes, with push-fit connection, DN/OD 110, SN 8 - 10 m wastewater sewer made of PP-MD solid-wall pipes, with push-fit connection, DN/OD 160, SN 8 - 20 m wastewater pressure pipe made of PE-100 RC, 16 bar, nominal size 63 x 5,8 mm - Drill and bond 950 reinforcing-steel bars into the edge of the floor slab - 58m² cast-in-place concrete floor slab D=20cm - Demolish 4 aluminum exterior doors - Demolish 6 plastic exterior windows - 34m saw cut in reinforced-concrete/aerated-concrete roof slab/exterior walls D=30cm - Demolish 52m² reinforced-concrete/aerated-concrete roof slab/exterior walls D=30cm - Remove 1.400m² interior gypsum plaster - 20 m² masonry made of aerated-concrete precision blocks DIN EN 771-4, D=30 cm - 24m² facing shell made of lightweight-concrete precision solid blocks - 24 reveal anchors made of square hollow section 40x4mm, L=1.800mm to 2.700mm - 2 lintel supports made of angle steel L200x8mm, L150x12mm, length 2.650mm - Demolish 710m² gravel fill and fleece on roof - Demolish 35m² roof waterproofing and insulation - 17 m³ cast-in-place reinforced concrete C25/30 to C30/37 - 4,5 m³ cast-in-place reinforced concrete LC20/22 RDK D1,2 - 0,5 t reinforcing-steel bars - 1,5 t reinforcing-steel mesh - Install 1 precast-concrete staircase - Install 3 precast-concrete wall caps - 280 m² calcium-silicate masonry, DIN EN 771-2, KS-R P D=11,5cm exposed masonry - 30 m² calcium-silicate masonry, DIN EN 771-2, KS-R P D=24cm - 3.200kg columns and beams made of structural steel HEA 120 to HEA260, L= 2.000-5.000mm - 20 brackets as welded components, steel S235JR, H= 350mm Scope of work, carport: - 325m³ soil from excavation pit, excavate, transport, store 0,3km, depth up to 4m, refill - 70m³ soil from excavation pit, excavate, transport, collect, load onto contractor's truck, depth up to 4m, dispose of - 45m PP-MD wastewater sewer, foul water, push-fit connection OD DN160 SN8 - 175m² cast-in-place concrete blinding layer for isolated footing, unreinforced C12/15 D 5cm - 116m² formwork for isolated footing H 0,5-1m - 6,8t reinforcing-steel bars B500A, diameter 10-16mm, isolated footing - 28 abutments U100 S235J2, individual mass 5 kg/unit - 112 galvanized-steel threaded bolts M20 L 1000 mm 8.8, individual mass 4,5 kg/unit - 14 head plates/templates S235J2, individual mass 5 kg/unit - 70m³ cast-in-place concrete for isolated footing, reinforced concrete C30/37 XF4 XC2 XD1 4-5m³ Procedure: open. Review the original TED notice for the complete requirement, lots, amendments and attachments.
Business details are available after sign in
Codes, capabilities, evidence, buyer details and marketplace actions are withheld from the public HTML and API response.