Germany – Structural shell work – Expansion of the Municipal Business School for the Integration of the State FOS - Building works
- Site setup - Specialized civil engineering works (bored pile foundation) - Laying of underground pipelines and local heating - Laying of ELT conduits - Earthworks - Reinforced concrete works - Masonry works - Plastering works - Partial demolition works - A
Opportunity description
- Site setup - Specialized civil engineering works (bored pile foundation) - Laying of underground pipelines and local heating - Laying of ELT conduits - Earthworks - Reinforced concrete works - Masonry works - Plastering works - Partial demolition works - Waterproofing works and insulation works General services: - Site setup plan, documentation, sampling Site setup: - Office, meeting, break room and sanitary container, 1 pc. each - Stair structure with temporary bridge: 1 pc. - Chemical toilet: 3 pcs. - Construction fence 111m, temporary barrier fence panels: 75m - Surveying service Earthworks: incl. explosive ordnance support - Excavation: approx. 1390m2 - Formation level preparation: approx. 2200m2 - Installation: approx. 960m2 - Disposal of pollutant-contaminated material: approx. 2500T - Fill material for site setup area: approx. 540m2 - Control tests of formation level subbase/base course: 8 pcs. - temporary water-control measure incl. pump sump, top-mounted basins: 5 pcs. Specialized civil engineering works incl. explosive ordnance support: - Bored pile foundation drilling: approx. 940m - Bored pile foundation piles: approx. 930m Concrete and reinforced concrete works - Blinding layers: approx. 740m2 - Cast-in-place concrete walls SB2/SB3: approx. 1070m3 - Strip foundations: approx. 110m3 - Individual foundations: 1m3 - Floor slabs/haunches, concrete: approx. 730m3 - Rectangular/round cast-in-place concrete columns: approx. 6.5m3 - Cast-in-place concrete slabs SB2/SB3: approx. 1030m2 - Downstand beams: approx. 11.5 m3 - Precast stairs: 3 x single-flight - Precast stairs (3 risers) 3 x single-flight - Precast seating steps 8 pcs. - Precast walls: 3m2 Waterproofing and insulation works: - Temporary waterproofing: approx. 110m2 - Bituminous waterproofing: approx. 105m2 - Perimeter insulation of floor slab: approx. 525m2 - Perimeter insulation of strip foundation: approx. 305m2 - Plinth insulation: approx. 50m2 - Insulation wedge: approx. 250m - Dimpled membrane: approx. 130m2 - Insulation board for building separation joint: 30m2 Masonry works incl. plastering works: - Interior walls made of block bricks, plastered/tiled on one or both sides: 33m2 - Interior walls, masonry bricks, exposed masonry: approx. 7m2 - Interior retaining wall at existing staircase, block bricks: approx. 2m2 - Double-skin exterior wall, incl. facing clinker masonry, perlite core insulation, block bricks: 18m2 - Gypsum-lime interior wall plaster: approx. 37m2 Demolition works incl. disposal: - Partial demolition of existing staircase incl. railing: 1 pc. - Dismantling of temporary existing staircase: 1 pc. - Partial demolition of floor structure: 7m2 - Partial demolition: drywall partition: 1 m2 - Partial demolition: existing exterior wall: 1 pc. Heating, ventilation, sanitary - New piping for approx. 410m of underground pipelines incl. construction of the required pipe trench - Installation of 7 pcs. manhole structures - Laying of local heating incl. construction of the required pipe trench, approx. 25m, incl. construction of a building connection in the new building and installation of a building entry bend - Dismantling works for 2 pcs. inspection chambers DN2000 - Removal of approx. 130m of underground pipelines made of plastic or vitrified clay up to DN200 - Removal of the former gas line up to DN200, approx. 50m Electrical works: - Temporary construction power supply for site setup with 7 temporary power distribution boards - Low-voltage installation system: conduit installation in formwork, approx. 670m of conduit - Lightning protection/earthing system, approx. 370m foundation and ring earth electrodes - Power supply for outdoor facilities, approx. 100m cable trench Procedure: open. Review the original TED notice for the complete requirement, lots, amendments and attachments.
Business details are available after sign in
Codes, capabilities, evidence, buyer details and marketplace actions are withheld from the public HTML and API response.