Germany – Structural shell work – GGJR Johannes Rau All-Day Secondary School, Siegesstraße 134 - Structural shell work for the new building and existing buildings EW1 and EW2
Structural shell work, including: site setup; approx. 1,650 m³ of excavation work for pipe trenches, drainage, foundations, approx. 620 m³ of crushed-stone base course, approx. 920 m³ of backfilling / filling work, approx. 370 m of drainage work; approx. 710 m² Spri
Opportunity description
Structural shell work, including: site setup; approx. 1,650 m³ of excavation work for pipe trenches, drainage, foundations, approx. 620 m³ of crushed-stone base course, approx. 920 m³ of backfilling / filling work, approx. 370 m of drainage work; approx. 710 m² of shotcrete, approx. 2,600 m³ of concrete work of various strength classes, partly waterproof concrete / concrete topping on semi-precast slabs, approx. 7,000 m² of formwork for external / internal walls, single- and double-sided, approx. 425 m² of formwork for floor slabs, approx. 1,675 m² of formwork for downstand / upstand beams, approx. 3,280 m² of semi-precast floor slabs, approx. 650 t of reinforcing steel, approx. 830 m² of masonry work of various formats / strength classes; approx. 2,800 m of ELT empty conduits, PVC-U; approx. 900 m² of external waterproofing, approx. 2,100 m² of fresh-concrete membrane, approx. 770 m of waterstop plates, partly PVC construction-joint waterstops or predetermined crack joints, approx. 3,100 m² of XPS external insulation boards of various thicknesses; concrete repair: approx. 3,650 m² of dry sandblasting of walls / ceilings, approx. 3,000 m² of shotcrete for concrete repair. Structural shell work including: site setup; approx. 1,650 m³ of excavation work for pipe trenches, drainage, foundations, approx. 620 m³ of crushed-stone base course, approx. 920 m³ of backfilling / filling work, approx. 370 m of drainage work; approx. 710 m² of shotcrete, approx. 2,600 m³ of concrete work of various strength classes, partly waterproof concrete / concrete topping on semi-precast slabs, approx. 7,000 m² of formwork for external / internal walls, single- and double-sided, approx. 425 m² of formwork for floor slabs, approx. 1,675 m² of formwork for downstand / upstand beams, approx. 3,280 m² of semi-precast floor slabs, approx. 650 t of reinforcing steel, approx. 830 m² of masonry work of various formats / strength classes; approx. 2,800 m of ELT empty conduits, PVC-U; approx. 900 m² of external waterproofing, approx. 2,100 m² of fresh-concrete membrane, approx. 770 m of waterstop plates, partly PVC construction-joint waterstops or predetermined crack joints, approx. 3,100 m² of XPS external insulation boards of various thicknesses; concrete repair: approx. 3,650 m² of dry sandblasting of walls / ceilings, approx. 3,000 m² of shotcrete for concrete repair. Procedure: open. Review the original TED notice for the complete requirement, lots, amendments and attachments.
Business details are available after sign in
Codes, capabilities, evidence, buyer details and marketplace actions are withheld from the public HTML and API response.