Germany – Structural shell work – Bültenweg Primary School, external elevator extension - structural shell work - LH
Structural shell work In addition to various dismantling and reinstallation work, the scope of services includes the following main quantities: 45 m² demolition of paved surface made of interlocking concrete paving blocks, d = approx. 8 cm. Relocation of 5 boulders 31 m² removal of landscaped areas incl. soil,
Opportunity description
Structural shell work In addition to various dismantling and reinstallation work, the scope of services includes the following main quantities: 45 m² demolition of paved surface made of interlocking concrete paving blocks, d = approx. 8 cm. Relocation of 5 boulders 31 m² removal of landscaped areas incl. soil, bushes/trees/plants 82 m³ excavation and removal of soil, for the excavation pit, elevator pit area and construction of a new basement staircase 1 item removal of basement staircase with railing and handrail 1 item partial removal of retaining wall for basement staircase with separation cut in concrete wall 1 item dismantling, storage and reinstallation of streetlight 55 m³ backfilling of working spaces 2 plate load tests 8 m³ lean concrete fill, C 16/20 12 m³ cast-in-place concrete for the floor slab and elevator walls 5 m³ cast-in-place concrete retaining wall with foundation 2 m³ cast-in-place concrete for flights of stairs and landings 65 m² formwork for elevator walls, floor slabs, retaining walls and flights of stairs 3.25 t reinforcing steel B500A in accordance with DIN 488 1 t welded reinforcing mesh B500A in accordance with DIN 488, stock mesh 24 items subsequent installation of starter reinforcement, injection mortar 4 anchor channels for load-bearing structures, profile 38/17, L = 1.60 m 8 m² perimeter insulation of the elevator walls 4 items dismantling of window element 3 items demolition of masonry parapet 6 items construction of reveals in facing masonry 1 item construction of concrete beam for rear anchoring in the exterior wall, on the 2nd floor Procedure: open. Review the original TED notice for the complete requirement, lots, amendments and attachments.
Business details are available after sign in
Codes, capabilities, evidence, buyer details and marketplace actions are withheld from the public HTML and API response.