Germany – Structural shell work – Structural shell work
On Querkamp, south of the Brüder-Grimm-Schule, a neighborhood center for young people, children, and their families is to be built. It will accommodate a mix of community, group, and multipurpose rooms as well as offices for the op
Opportunity description
On Querkamp, south of the Brüder-Grimm-Schule, a neighborhood center for young people, children, and their families is to be built. It will accommodate a mix of community, group, and multipurpose rooms as well as offices for the operators. The planned building comprises two full stories and an attic story and has no basement. It will be constructed using a timber-frame skeleton structure with a solid building core and will have a purlin roof with extensive green roofing as well as a PV system. Access to the construction site will be via the public street Querkamp. Due to the large number of trees in the front area of the building site that must be preserved, the construction site setup area is very limited. Part of the school parking lot adjoining to the north can be accessed by small trucks. A temporary stopping bay will be created parallel to the street on the building site, which can be used for loading and unloading with a crane. All public streets, sidewalks, and parking spaces must be kept clear. The bill of quantities comprises: - Earthworks - Infiltration works, infiltration trench - Reinforced concrete works for foundations, floor slab, elevator, columns, beams, ceilings - Masonry works for load-bearing interior walls - Building services installations such as underground pipes, electrical systems - Tree protection measures Main works: - Excavation of soil material, subsoil improvement - Reinstallation of soil material or proper disposal - Installation of infiltration trench and perimeter drainage - Construction of strip and individual foundations, concrete base slab including insulation - Construction of elevator pit in watertight concrete and elevator shaft - Construction of masonry interior walls, reinforced-concrete columns, beams, ceilings, stairs - Construction of underground sanitary and rainwater pipes - Single-utility building service entries for electricity, fresh water, etc. Procedure: open. Review the original TED notice for the complete requirement, lots, amendments and attachments.
Business details are available after sign in
Codes, capabilities, evidence, buyer details and marketplace actions are withheld from the public HTML and API response.