Germany – Switching station installation work – New construction of VLZ and conversion of FIT, building and plant automation
New construction of VLZ and conversion of FIT, building and plant automation. Creation of building and plant automation comprises the following main items: - Automation station: automation equipment, according to GA function list, supplement 070-5, network type safety pow
Opportunity description
New construction of VLZ and conversion of FIT, building and plant automation. Creation of building and plant automation comprises the following main items: - Automation station: automation equipment, according to GA function list, supplement 070-5, network type safety power supply SV, without switching time, ambient temperature 0 to 45 degrees C, relative ambient humidity 5 to 90% (non-condensing), for installation in control cabinet, with BACnet communication interface according to AMEV certificate profile AS-B, incl. number and type of physical/common 1 pc; - Switchgear, services and connection work: coordination between GA trade and switchgear coordination effort for agreements between the GA trade and control cabinet construction, including, among other things: preparation of the technical data of control components coordination of the identification and plant codes (KAS) as well as equipment identification provision of the allocation lists for the automation stations provision of the technical data of the electrical devices to be connected 1 pc; - Cabling: installation cable DIN J 3 x 1.5, Cu number 43 6,937.00 m; installation cable, symmetrical, DIN VDE 0815 (VDE 0815), J-Y(St)Y, 2 x 2 x 0.8 Bd 7,509.00 m. Procedure: open. Review the original TED notice for the complete requirement, lots, amendments and attachments.
Business details are available after sign in
Codes, capabilities, evidence, buyer details and marketplace actions are withheld from the public HTML and API response.