Germany – Technical building-inspection services – Extension and energy-efficient renovation of the Ludwig-Reinhard School with construction of a new double school sports hall in 87600 Kaufbeuren
The Ludwig-Reinhard School is a special education center focusing on intellectual development and currently serves as a place of learning for 172 students. Due to the intensive assistance provided, almost 100 educators and specialists are employed here. The expanded
Opportunity description
The Ludwig-Reinhard School is a special education center focusing on intellectual development and currently serves as a place of learning for 172 students. Due to the intensive assistance provided, almost 100 educators and specialists are employed here. The expanded existing building can be divided into several building sections: the west section (built in 1967, three stories) will undergo complete renovation and be extended westward; the southwest section (built in 1987, two stories + basement) will be renovated; the northwest section (built in 1967, single-story), including the small sports hall and assembly hall, will be demolished, and the assembly hall will be rebuilt as an extension. The north section (built in 2000, single-story) will remain unaffected by the renovation measures, but will accommodate 3 primary school classes as an interim facility during construction. The new double sports hall is planned as a detached building in the southeast of the property. The BRI of the existing building is 18,535 m². After renovation and extension, including the sports hall, it will be 37,634 m². Measurement of the air change rate or air permeability using the blower-door method pursuant to GEG DIN EN ISO 9972 for the school and gymnasium building sections. Performance of additional measurements on an additional measurement day for the school and gymnasium building sections. Preparation of an investigation report for the school and gymnasium building sections. Performance of any additionally required sealing work prior to measurement for the school and gymnasium building sections. Leak detection during measurement for the school and gymnasium building sections. Procedure: open. Review the original TED notice for the complete requirement, lots, amendments and attachments.
Business details are available after sign in
Codes, capabilities, evidence, buyer details and marketplace actions are withheld from the public HTML and API response.