Germany – Theatre construction work – Metalwork III
Metalwork III Lot 1 - Doors and windows Manufacture and installation of 5 T30/T30RS fire doors made of sheet steel Manufacture and installation of a multi-part door system consisting of 3 double-leaf glass-frame T30RS fire doors, as well as 2
Opportunity description
Metalwork III Lot 1 - Doors and windows Manufacture and installation of 5 T30/T30RS fire doors made of sheet steel Manufacture and installation of a multi-part door system consisting of 3 double-leaf glass-frame T30RS fire doors, as well as 2 glazed end elements Manufacture and installation of 11 access doors to shafts and 9 shaft hatches Inspection and maintenance of approx. 150 existing steel side-hung windows, including repair of approx. 20 units Lot 2 Metalwork Restoration and repair of approx. 35 m² of walkable grating floors as ceiling structures Manufacture of a walkable grating level in a ventilation shaft and shaft covers for 4 pits for lifting systems measuring 0.8 to 3.65 m² Adaptation of existing railings at 24 box parapets, 18 box entrances and 12 hoop railings in the opera auditorium, as well as the manufacture of 23 m of parapet and ramp railings Manufacture and installation of impact-protection grilles assembled from 4-5 individual elements in front of 19 vertically mounted radiators up to a height of 6.50 m above finished floor level Various metal construction and metalwork tasks such as the manufacture and installation of brackets, shower curtain rods, and fall protection in front of windows. Lot 3 Box parapet elements Installation of 133 prefabricated parapet elements made of transparent Plexiglas in the shortened and reworked parapet railings of the boxes in the opera auditorium. Procedure: open. Review the original TED notice for the complete requirement, lots, amendments and attachments.
Business details are available after sign in
Codes, capabilities, evidence, buyer details and marketplace actions are withheld from the public HTML and API response.