Germany – Track construction works – A 17-26 WeA-HN Outdoor areas and track systems
Outdoor areas and track systems Demolition Approx. 700 m² paved surfaces Approx. 350 m curbs Approx. 10 cable chambers Approx. 1,500 m³ earth excavation New construction Approx. 4,200 m formation level Approx. 25 concrete drainage chambers, DN 800–1200 Approx. 480 m drainage pipeline
Opportunity description
Outdoor areas and track systems Demolition Approx. 700 m² paved surfaces Approx. 350 m curbs Approx. 10 cable chambers Approx. 1,500 m³ earth excavation New construction Approx. 4,200 m formation level Approx. 25 concrete drainage chambers, DN 800–1200 Approx. 480 m plastic drainage pipelines, DN 110 to DN 310 Approx. 300 m plastic water supply pipelines Approx. 38 concrete cable chambers, sizes IV to IX Approx. 3,000 m plastic conduits DN 110 in cable routes with 1–20 ducts Approx. 150 m underground electrical lines Approx. 30 individual cast-in-place concrete foundations for technical installations Approx. 1,800 m³ frost protection and crushed-stone base layers Approx. 500 m² concrete track support slab 4 units Installation of grooved-rail switches on concrete support slab Approx. 175 m installation of tie-rod track on concrete support slab Approx. 345 m installation of sleeper track with concrete grouting Approx. 95 m installation of Vignoles rail track on individual support points Approx. 7 m installation of Vignoles rail track with full grouting 5 fixed buffer stops Approx. 96 m rails, S20 profile on individual support points Approx. 46 units Installation of track drainage boxes Approx. 50 units Installation of track connection boxes Approx. 1,000 m rail-foot encasement Approx. 180 units tie-rod encasement Approx. 2,000 m chamber filler elements for grooved rails, inside/outside Approx. 150 m³ tree substrate Approx. 600 m³ crushed-stone base layer Approx. 1,600 m concrete curbstones Approx. 30 m concrete retaining wall panels 12 tree pits Approx. 3,800 m² asphalt base course Approx. 150 m² asphalt binder course Approx. 3,800 m² asphalt surface course Approx. 2,000 m rail-joint sealing Procedure: neg-w-call. Review the original TED notice for the complete requirement, lots, amendments and attachments.
Business details are available after sign in
Codes, capabilities, evidence, buyer details and marketplace actions are withheld from the public HTML and API response.