Germany – Track construction works – GMT 2027 Package 5 - 4 Lots Region N, N, N, SW
GMT 2027 Package 5 - 4 Lots Lot 1 Route 1741 Estorf - Leese-Stolzenau Lot 2 Route 1150 Lüneburg - Dalldorf Lot 3 Route 1503/1500 Hude - Berne Lot 4 Route 4000 Mannheim Hbf - Basel - Konstanz Route 1741 Estorf-Leese Stolzenau approx. 9.4
Opportunity description
GMT 2027 Package 5 - 4 Lots Lot 1 Route 1741 Estorf - Leese-Stolzenau Lot 2 Route 1150 Lüneburg - Dalldorf Lot 3 Route 1503/1500 Hude - Berne Lot 4 Route 4000 Mannheim Hbf - Basel - Konstanz Route 1741 Estorf-Leese Stolzenau approx. 9.451 m mechanical track renewal approx. 6.817 m mechanical ballast cleaning approx. 805 m complete mechanical ballast renewal approx. 1.829 m mechanical formation improvement approx. 164 m conventional GE approx. 334 m conventional vBE approx. 100 m conventional PSS 1 turnout renewal (incl. connection lengths) 1 buffer stop approx. 5.250 m ditch profiling approx. 9.800 m construction of side path 8 level crossings Associated works Logistics ///// according to construction contract: Start of execution on the construction site: 10.05.2027 Completion of the contractual service: 30.12.2027 /// For the following services, the company intended to perform the work must be prequalified in a prequalification procedure with Deutsche Bahn AG. A corresponding declaration must be submitted with the tender in the Open Procedure. Additional documents are not desired. Information on the conditions for participation and the prequalification procedure can be found in the Conditions for Application, Item 18, and the Special Conditions of Contract. required prequalification - Lot 1: Conventional superstructure-ballast: Tracks - Routes III; regional transport 50 - 120 km/h Turnouts - Routes III; regional transport 50 - 120 km/h Route 1150 Lüneburg – Dalldorf approx. 10.018 m mechanical track renewal approx. 1.280 m mechanical sleeper renewal approx. 11.298 m mechanical ballast cleaning approx. 607 m conventional GE approx. 607 m conventional vBE approx. 11.484 m construction of side path 9 bridge sleepers approx. 66 m guard rails 6 level crossings approx. 21.512m rail grinding approx. 500 m2 clearing of construction site approx. 189 units obstacles to be protected 1 expansion rail Associated works Logistics ///// according to construction contract: Start of execution on the construction site: 05.02.2027 Completion of the contractual service: 30.04.2028 /// For the following services, the company intended to perform the work must be prequalified in a prequalification procedure with Deutsche Bahn AG. A corresponding declaration must be submitted with the tender in the Open Procedure. Additional documents are not desired. Information on the conditions for participation and the prequalification procedure can be found in the Conditions for Application, Item 18, and the Special Conditions of Contract. required prequalification - Lot 2: Conventional superstructure-ballast: Tracks - Routes III; regional transport 50 - 120 km/h Route 1503/1500 Hude - Berne approx. 2.198 m mechanical track renewal approx. 2.198 m mechanical ballast cleaning approx. 2.198 m mechanical formation improvement approx. 1.183 m conventional GE approx. 1.183 m conventional vBE 4 turnout renewals (incl. connection lengths) 1 (crossing) turnout renewal with PSS (incl. connection lengths) approx. 5.901 m construction of side path 5 level crossings Explosive ordnance Associated works Logistics ///// according to construction contract: Start of execution on the construction site: 16.04.2027 Completion of the contractual service: 30.12.2027 /// For the following services, the company intended to perform the work must be prequalified in a prequalification procedure with Deutsche Bahn AG. A corresponding declaration must be submitted with the tender in the Open Procedure. Additional documents are not desired. Information on the conditions for participation and the prequalification procedure can be found in the Conditions for Application, Item 18, and the Special Conditions of Contract. required prequalification - Lot 3: Conventional superstructure-ballast: Tracks - Routes III; regional transport 50 - 120 km/h Turnouts - Routes III; regional transport 50 - 120 km/h Route 4000 Offenburg - Niederschopfheim approx. 3.414 m mechanical track renewal approx. 104 m mechanical rail renewal approx. 1576 m mechanical ballast cleaning approx. 1.838 m complete mechanical ballast renewal approx. 2.125 m mechanical formation improvement approx. 508 m conventional GE approx. 508 m conventional vBE approx. 100 m conventional PSS approx. 838 m deep drainage approx. 571 m ditch profiling approx. 2.227 m construction of side path approx. 887 m cable duct approx. 122 units bridge sleepers approx. 95 m guard rails approx. 19.767 m² explosive ordnance complex logistics services Safety and construction-related services Associated works ///// according to construction contract: Start of execution on the construction site: 30.05.2027 Completion of the contractual service: 30.09.2027 /// For the following services, the company intended to perform the work must be prequalified in a prequalification procedure with Deutsche Bahn AG. A corresponding declaration must be submitted with the tender in the Open Procedure. Additional documents are not desired. Information on the conditions for participation and the prequalification procedure can be found in the Conditions for Application, Item 18, and the Special Conditions of Contract. required prequalification - Lot 4: Conventional superstructure-ballast: Tracks - Routes II; mixed traffic 121 - 160 km/h Safety services - Directory III Procedure: open. Review the original TED notice for the complete requirement, lots, amendments and attachments.
Business details are available after sign in
Codes, capabilities, evidence, buyer details and marketplace actions are withheld from the public HTML and API response.