Germany – Track construction works – Lübeck-Büchen - Embankment strengthening (FMI) incl. track superstructure renewal, diversion route line 1121
For the strengthening of the Lübeck – Büchen diversion route (line 1121), which is to be implemented as part of the general renovation of Lübeck - Hamburg, various services must be diverted. In order to accommodate the diverted services expected during the 5-month
Opportunity description
For the strengthening of the Lübeck – Büchen diversion route (line 1121), which is to be implemented as part of the general renovation of Lübeck - Hamburg, various services must be diverted. In order to accommodate on line 1121 the diverted services expected during the 5-month complete closure of line 1120 (Lübeck – Hamburg), block optimization must be carried out along the entire line. In addition, three culverts and three retaining walls will be renewed, and the existing platforms in Mölln and Ratzeburg will be provisionally extended by approx. 120 m. This also includes embankment strengthening by means of FMI, including track superstructure renewal with PSS. As part of the measure concerned here, the construction works for the embankment strengthening and the track superstructure are to be awarded. In the area from km 31,900 – 37,800, the embankment is to be strengthened in four sections over a total length of 3.25 km using the milling-mixing-injection method (FMI), and the track superstructure and the formation protection layer (PSS), as well as the cable routing system, are to be renewed or installed for the first time over a total length of 8 km (km 29,900 to km 37,800). Procedure: open. Review the original TED notice for the complete requirement, lots, amendments and attachments.
Business details are available after sign in
Codes, capabilities, evidence, buyer details and marketplace actions are withheld from the public HTML and API response.