Germany – Trench sheeting work – 175855_CN_FCI_KKE-03-02_Earthworks / Shoring / Explosive Ordnance / Dewatering
Shoring work (DIN 18 303); earthworks (DIN 18300); dewatering work (DIN 18 305); explosive ordnance clearance work (DIN 18 323); construction of an excavation pit with dewatering, diaphragm wall shoring with extensive structural-steel walers and bracing in
Opportunity description
Shoring work (DIN 18 303); earthworks (DIN 18300); dewatering work (DIN 18 305); explosive ordnance clearance work (DIN 18 323); construction of an excavation pit with dewatering, diaphragm wall shoring with extensive structural-steel walers and bracing on two levels, underpinning work on existing buildings, micropiles as uplift protection, dewatering with wells, excavation and disposal of soil, including site clearance and construction-accompanying explosive ordnance detection Excavation pit approx. 65 x 50 m; depth up to 12.75 m below top of terrain Earthworks, demolition and dismantling work, drilling work, work for the completion of boreholes, shoring work, diaphragm wall work, jet-grouting work, pile-driving, vibratory-driving and pressing work, explosive ordnance work, structural-steel work Procedure: open. Review the original TED notice for the complete requirement, lots, amendments and attachments.
Business details are available after sign in
Codes, capabilities, evidence, buyer details and marketplace actions are withheld from the public HTML and API response.