Germany – Underground work other than tunnels, shafts and subways – New construction of 257 accommodations, civil engineering and external works, accommodation building – Rommel Barracks – Dornstadt
Civil engineering and external works, accommodation building – Rommel Barracks – Dornstadt Civil engineering and external works: 1.100 m³ earth excavation for angle retaining elements, retention basin 2.900 m³ sewer trench excavation 160 m³ utility trench excavation 450 m³ cable trench excavation 11
Opportunity description
Civil engineering and external works, accommodation building – Rommel Barracks – Dornstadt Civil engineering and external works: 1.100 m³ earth excavation for angle retaining elements, retention basin 2.900 m³ sewer trench excavation 160 m³ utility trench excavation 450 m³ cable trench excavation 1160 m wastewater/stormwater sewer pipelines up to DN 250 36 pcs. prefabricated wastewater and stormwater manholes DN 1000 8 pcs. cable manholes 1,45x0,80x1,29 m 210 m conduits DN 50 350 m conduits DN 75 1.800 m conduits DN 110 30 m water pipeline 66 m district heating pipeline 688 m edging 86 m angle retaining elements 22 pcs. concrete block steps 24 m railing 450 m façade drainage channels 650 m² asphalt base and surface course 655 m² paved areas 9700 m² topsoil works Procedure: open. Review the original TED notice for the complete requirement, lots, amendments and attachments.
Business details are available after sign in
Codes, capabilities, evidence, buyer details and marketplace actions are withheld from the public HTML and API response.