Germany – Underground work other than tunnels, shafts and subways – BA 1.2 Utility infrastructure development and soil remediation Lots 1 and 2
BA 1.2 Utility infrastructure development and soil remediation Lots 1 and 2 Lot 1 – Development measure Building 5 • Topsoil removal: approx. 320 m³ with an average removal depth of 15 cm • Surface demolition: approx. 1,070 m² of asphalt, concrete, gravel and paved surfaces
Opportunity description
BA 1.2 Utility infrastructure development and soil remediation Lots 1 and 2 Lot 1 – Development measure Building 5 • Topsoil removal: approx. 320 m³ with an average removal depth of 15 cm • Surface demolition: approx. 1,070 m² of asphalt, concrete, gravel and paved surfaces as well as approx. 170 m of curbstones. • Demolition of crane runway/pile foundations: approx. 345 m³ of reinforced concrete demolition, plus approx. 500 m³ of soil exposure. • Soil remediation: approx. 3,790 m³ of contaminated soil excavation in the area of Building 5. • Construction of traffic facilities: approx. 1,900 m², including approx. 1,300 m² of asphalt, 200 m² of paving, approx. 450 m of curbstones and 175 m of paved gutter. • Construction of stormwater pipeline: approx. 149 m of PP pipe + 70 m of concrete pipe DN 600, plus 10 street drains. • Relocation of drinking water pipeline: relocate approx. 48 m of PE pipeline. • Earthworks for cable/utility routes: lighting cable approx. 315 m, broadband conduits approx. 120 m, power route approx. 100 m. • Earthworks for local heating/cooling water: approx. 82 m of local heating route and approx. 92 m of cooling water route; additionally dismantle approx. 25 m of existing local heating duct. • Groundwater lowering: Temporary groundwater lowering, including dewatering, must be provided and operated for the performance of the civil engineering and pipeline works. • Soil disposal: approx. 12,400 t in total. Lot 2 – Replacement construction of Building 5 • Topsoil removal: approx. 270 m² with an average removal depth of 15 cm • Surface demolition: approx. 1,850 m² of asphalt, concrete and gravel surfaces as well as approx. 110 m of curbstones, 3 street drains and 1 steel water chamber. • Construction of traffic facilities/construction road: approx. 1,300 m² of construction road. • Construction of wastewater pipeline: approx. 120 m of PP pipe. • Subgrade drainage: approx. 150 m of DN 100 drainage pipe + 4 pump shafts. • Construction of stormwater pipeline: approx. 155 m of PP pipe. • Construction of drinking water pipeline: approx. 115 m of PE pipeline; additionally dismantle approx. 80 m of existing steel pipeline. • Earthworks for cable/utility routes: conduits for utilities for the test area approx. 400 m, lighting cable approx. 155 m, broadband conduits approx. 225 m, power route approx. 145 m. • Interim measure for oil storage support: Construction of an approx. 36 m² area with concrete track slabs on a gravel base course. Procedure: open. Review the original TED notice for the complete requirement, lots, amendments and attachments.
Business details are available after sign in
Codes, capabilities, evidence, buyer details and marketplace actions are withheld from the public HTML and API response.