Germany – Underground work other than tunnels, shafts and subways – Education Campus – New Secondary School in Görlitz | Lot 8001 – Civil Engineering | Open procedure pursuant to § 3 No. 1 VOB/A EU
Education Campus – New Secondary School in Görlitz | Lot 8001 – Civil Engineering | Open procedure pursuant to § 3 No. 1 VOB/A EU Earthworks and soil excavation approx. 1,300 m³; soil replacement and soil improvement approx. 125 m³; remove crushed-stone base courses and re
Opportunity description
Education Campus – New Secondary School in Görlitz | Lot 8001 – Civil Engineering | Open procedure pursuant to § 3 No. 1 VOB/A EU Earthworks and soil excavation approx. 1,300 m³; soil replacement and soil improvement approx. 125 m³; remove and restore crushed-stone base courses approx. 180 m³; supply, install and compact construction materials approx. 800 m³; dewatering for utility trenches approx. 470 m; exploratory trenches and hand excavation approx. 65 m³; clearing and pruning work approx. 200 m² / 16 units; remove asphalt, concrete and paved surfaces approx. 1,940 m²; dismantle curbing systems approx. 100 m; remove manholes and road drains approx. 20 units; demolish or fill pipelines approx. 150 m; construct rainwater pipelines DN 150–200 approx. 405 m; construct RW utility trenches and excavations approx. 940 m³; shoring for pipe trenches and excavations approx. 450 m²; construct RW tanks with flow-control systems approx. 3 units; construct RW treatment plant approx. 1 unit; construct manholes and manhole covers approx. 27 units; leak tests and camera inspection approx. 405 m; construct wastewater pipelines and pressure pipelines approx. 85 m; construct SW utility trenches and excavations approx. 185 m³; construct grease separator system approx. 1 unit. Construct manholes and manhole covers approx. 10 units; leak tests and camera inspection approx. 65 m; construct cable trenches approx. 80 m; cable protection, backfilling and electrical grounding work approx. 32 m³ Procedure: open. Review the original TED notice for the complete requirement, lots, amendments and attachments.
Business details are available after sign in
Codes, capabilities, evidence, buyer details and marketplace actions are withheld from the public HTML and API response.