Germany – Underground work other than tunnels, shafts and subways – Construction project Heinrich-Böll-Str. - Felling and clearing works - temporary path connection Building 3 - utility route
In connection with the above-mentioned works, essentially the following works are to be carried out: - Tree felling (approx. 23Stk.) - Clearing of shrub stock (approx. 1.175qm) - Demolition of paved surfaces (approx. 215qm) - Soil excavation for utility trenches (approx.135cb
Opportunity description
In connection with the above-mentioned works, essentially the following works are to be carried out: - Tree felling (approx. 23Stk.) - Clearing of shrub stock (approx. 1.175qm) - Demolition of paved surfaces (approx. 215qm) - Soil excavation for utility trenches (approx.135cbm) - Empty cable conduits DN 110 (approx. 500lfm) - Cable chambers (approx. 3 Stk.) - Water-bound path surface (approx. 120qm) - Paved path surface (approx. 225qm) - Concrete block steps (approx. 30lfm) - Handrail (approx. 12lfm) Procedure: open. Review the original TED notice for the complete requirement, lots, amendments and attachments.
Business details are available after sign in
Codes, capabilities, evidence, buyer details and marketplace actions are withheld from the public HTML and API response.