Germany – Ventilation and air-conditioning installation work – KKHN - 430-01-BA 2C+D - Ventilation and air-conditioning systems BA 2C+D
KKHN - 430-01-BA 2C+D - Ventilation and air-conditioning systems BA 2C+D 1x supply/exhaust air system in accordance with DIN1946,T4 incl. KV-WRG with 5,300 m³/h for the MVZ area, ground floor, south side 1x supply/exhaust air system in accordance with DIN1946, T4 incl. KV-WRG with 15,000 m³/h for the ZNA/X-ray/MRI
Opportunity description
KKHN - 430-01-BA 2C+D - Ventilation and air-conditioning systems BA 2C+D 1x supply/exhaust air system in accordance with DIN1946,T4 incl. KV-WRG with 5,300 m³/h for the MVZ area, ground floor, south side 1x supply/exhaust air system in accordance with DIN1946, T4 incl. KV-WRG with 15,000 m³/h for the ZNA/X-ray/MRI area, ground floor, south side 1x supply/exhaust air system incl. rotor-WRG with 4,500 m³/h for the technical area, basement level 1, south side 1x supply/exhaust air system in accordance with DIN1946, T4 incl. KV-WRG with 5,000 m³/h for the Decision Unit / Radiology area, ground floor, north-east side 1 pc. outdoor air tower 1.6 x 4.5 m up to 22,000 m³/h, approx. 200 pcs. components such as BSKs + VSR (electrical and mechanical) ventilation and air-conditioning distribution network with approx. 3,000 m² of ventilation and air-conditioning ducts as well as approx. 1,000 linear metres of spiral-seam pipes incl. thermal insulation Smoke extraction system with approx. 10,000 m²/h with axial fan, F-90 duct + extraction hoses DN450 Dismantling and disposal of 1x operating-room supply-air ceiling approx. 3 x 3m, ventilation ducts, components + insulation on the ground floor Procedure: open. Review the original TED notice for the complete requirement, lots, amendments and attachments.
Business details are available after sign in
Codes, capabilities, evidence, buyer details and marketplace actions are withheld from the public HTML and API response.