Germany – Ventilation installation work – 6141-14 Conversion and extension of the Bürgersaal in Geisenhausen, Trade 0581-430 – Ventilation work
Construction of the ventilation systems. - approx. 1 supply and exhaust air unit with heat recovery, 28,000 m³/h - approx. 2 exhaust air fans - approx. 1,700 m² rectangular galvanized ventilation duct - approx. 510 m round galvanized ventilation ducting, DN 100–DN 250 - approx. 30 rectangular fire dampers
Opportunity description
Construction of the ventilation systems. - approx. 1 supply and exhaust air unit with heat recovery, 28,000 m³/h - approx. 2 exhaust air fans - approx. 1,700 m² rectangular galvanized ventilation duct - approx. 510 m round galvanized ventilation ducting, DN 100–DN 250 - approx. 30 rectangular fire dampers - approx. 10 round fire dampers - approx. 170 cross-talk silencers for installation in ducts - approx. 20 rectangular silencers - approx. 35 disc valves - approx. 30 swirl diffusers - approx. 17 exhaust air grilles - approx. 125 linear slot diffusers in continuous-strip design - approx. 175 round mechanical volume flow limiters - approx. 20 rectangular mechanical volume flow controllers - approx. 20 rectangular motorized volume flow controllers Procedure: open. Review the original TED notice for the complete requirement, lots, amendments and attachments.
Business details are available after sign in
Codes, capabilities, evidence, buyer details and marketplace actions are withheld from the public HTML and API response.