Germany – Ventilation installation work – Ventilation technology
As part of a fire protection renovation, the ventilation ducts of the IGS Linden sports halls are being renewed. The scope of work includes the dismantling and new construction of ventilation ducts, air outlets, and fire dampers, including contro
Opportunity description
As part of a fire protection renovation, the ventilation ducts of the IGS Linden sports halls are being renewed. The scope of work includes the dismantling and new construction of ventilation ducts, air outlets, and fire dampers, including controls, insulation, commissioning, documentation, and maintenance. Quantity extract: Ventilation ducts, total surface area: approx. 1,500 m², spiral-seam pipes, total: approx. 630 m, ceiling swirl diffusers: 36 units, fire dampers, total: approx. 23 units, insulation of HVAC systems: approx. 1,500 m² Procedure: open. Review the original TED notice for the complete requirement, lots, amendments and attachments.
Business details are available after sign in
Codes, capabilities, evidence, buyer details and marketplace actions are withheld from the public HTML and API response.